Cache entry for E 09/2176

Extracted from MTO on 20-Sep-2020 04:18, last changed 04-Aug-2020.

Tenement Summary

Identifier:E 09/2176Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:PERTHArea:16 BL
Purposes:Term:5 Years
Markout:Received:18-Feb-2016 13:15
Commence:07-Jul-2017 Expiry:06-Jul-2022

Holders

Company NameSharesTotal Shares
DIVERSIFIED ASSET HOLDINGS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
DIVERSIFIED ASSET HOLDINGS PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847018-Feb-2016 16.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.07-Jul-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-Jul-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-Jul-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-Jul-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-Jul-2017
61The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve R44094.07-Jul-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.07-Jul-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.07-Jul-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.07-Jul-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.07-Jul-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
07-Jul-2017
61The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Repeater Station Site Reserve R44094.07-Jul-2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202103-Aug-2020 10157059$3,808.0016 BL07-Jul-2017 $3,808.00$0.00
Rental202022-Jul-2019 10106391$32.0016 BL07-Jul-2017 $2,208.00$0.00
Rental202008-Jul-2019 10104347$2,176.00
Rental201913-Aug-2018 06-166994PERTH$2,176.0016 BL07-Jul-2017 $2,176.00$0.00
Rental201818-Feb-2016 06-151976PERTH$2,004.0016 BL07-Jul-2017 $2,004.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$30,000.00false
2020$20,000.00false
2019$20,000.0018-Jun-2019 $33,120.00$0.00$0.00$0.00$0.00$0.00$33,120.00false
2018$20,000.0030-Aug-2018 $36,716.00$0.00$0.00$0.00$0.00$0.00$36,716.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
09-Sep-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-10-052017-02-05CLEARED - Expedited Applies2017-07-0616 BL24390S115440E69km NE'ly of Gascoyne JunctionWO2017/00872017-01-26WC1997/028Objection Withdrawn Agreement2017-07-03Gnulli(WC1997/028)WC1997/028WAD6161/1998trueDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation