Cache entry for E 09/1764

Extracted from MTO on 25-Nov-2020 03:37, last changed 23-Jul-2020.

Tenement Summary

Identifier:E 09/1764Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:KARRATHAArea:5 BL
Purposes:Term:5 Years (Extended)
Markout:Received:12-Mar-2010 11:27
Commence:09-May-2011 Expiry:08-May-2021

Holders

Company NameSharesTotal Shares
GASCOYNE RESOURCES LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
GASCOYNE RESOURCES LIMITED100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847012-Mar-2010 5.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.09-May-2011
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.09-May-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.09-May-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.09-May-2011
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.09-May-2011
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
09-May-2011
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.09-May-2011
81The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • "Programme of Work on E09/1325 and E09/1764 for Gascoyne Resources Limited" (Reg. ID 33556) dated 19 December 2011 signed by Di Tyly-Laurie and retained on Department of Mines and Petroleum file No. EARS-POW-33556.
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail.
22-Feb-2012
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.22-Feb-2012
101All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.22-Feb-2012

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.09-May-2011
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.09-May-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.09-May-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.09-May-2011
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.09-May-2011
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
09-May-2011
71No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.09-May-2011
81The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • "Programme of Work on E09/1325 and E09/1764 for Gascoyne Resources Limited" (Reg. ID 33556) dated 19 December 2011 signed by Di Tyly-Laurie and retained on Department of Mines and Petroleum file No. EARS-POW-33556.
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail.
22-Feb-2012
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.22-Feb-2012
101All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.22-Feb-2012

Dealings

TypeNumberDetails
Application to Amend342835Lodged:10:52 17 March 2010By amending the Form 21 to include the ACN 139 522 900RECORDED:10:52 17 March 2010
Application to Amend366499Lodged:11:43 25 February 2011Amending:AddressFrom:GASCOYNE RESOURCES LIMITED, SUITE 7, 29 ORD STREET, WEST PERTH, WA, 6005To:GASCOYNE RESOURCES LIMITED, C/- ANDERSON'S TENEMENT MANAGEMENT, P O BOX 2162, WARWICK, WA, 6024RECORDED:11:43 25 February 2011
Application to Amend439480Lodged:12:15 29 January 2014Amending:AddressFrom:GASCOYNE RESOURCES LIMITED, C/- ANDERSONS TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:GASCOYNE RESOURCES LIMITED, PO BOX 1340, WEST PERTH, WA, 6872RECORDED:12:15 29 January 2014
Partial Surrender - Voluntary443376Lodged:15:10 01 April 2014Surrendered Blocks:MEEKATHARRA 1104 t, y, z MEEKATHARRA 1176 e, k MEEKATHARRA 1177 f, g, l MEEKATHARRA 1248 k, p MEEKATHARRA 1249 f, l, q, v MEEKATHARRA 1321 aSurrendered Total:15 BL.REGISTERED:15:10 01 April 2014
Partial Surrender - Voluntary449696Lodged:15:00 26 June 2014Surrendered Blocks:MEEKATHARRA 1176 d, j, p, u, z MEEKATHARRA 1177 v, w, x MEEKATHARRA 1178 y MEEKATHARRA 1249 m, n, r, s, w, x MEEKATHARRA 1250 b, c, d, e, h, j, k, o, p, t, u, w, x MEEKATHARRA 1251 a, b, f, g, l, m MEEKATHARRA 1321 b, c, d, e, j, kSurrendered Total:40 BL.REGISTERED:15:00 26 June 2014
Partial Surrender - Voluntary455808Lodged:16:05 06 October 2014Surrendered Blocks:MEEKATHARRA 1178 xSurrendered Total:1 BL.REGISTERED:16:05 06 October 2014
Partial Surrender - Voluntary460278Lodged:11:30:38 13 January 2015Surrendered Blocks:MEEKATHARRA 1178 z MEEKATHARRA 1179 q, r, v, w MEEKATHARRA 1248 e MEEKATHARRA 1249 a, o, p, t, u, y, z MEEKATHARRA 1250 f, g, l, m, n, q, r, s, vSurrendered Total:22 BL.REGISTERED:11:30:38 13 January 2015
Extension / Renewal of Term486324Lodged:15:58:36 06 May 2016Applied For Period:5 YearsRECORDED:15:58:36 06 May 2016GRANTED:08 August 2016Granted Period:5 YearsTerm Extended To:08/05/2021
Application to Amend505946Lodged:15:53:38 08 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES LIMITED, SAME AS CORRESPONDENCE and DTC :GASCOYNE RESOURCES LIMITED, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES LIMITED, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036REJECTED:15:53:38 08 May 2017
Application to Amend506176Lodged:09:37:23 12 May 2017Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE RESOURCES LIMITED, SAME AS CORRESPONDENCE and DTC :GASCOYNE RESOURCES LIMITED, PO BOX 1340, WEST PERTH, WA, 6872To:Principal Place of Business : GASCOYNE RESOURCES LIMITED, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036 and DTC :GASCOYNE RESOURCES LIMITED, STS, C/- STS, PO BOX 1340, WEST PERTH, WA, 6872, xxxx@strategictenements.com, xxxxxxx036RECORDED:09:37:23 12 May 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202106-May-2020 10143488$3,005.005 BL13-Jan-2015 $3,005.00$0.00
Rental202030-Apr-2019 10094141$2,835.005 BL13-Jan-2015 $2,835.00$0.00
Rental201916-Apr-2018 GCY 180416-9 GASCOYNE RES$2,675.005 BL13-Jan-2015 $2,675.00$0.00
Rental201818-May-2017 MT-210011072065-EF$1,366.755 BL13-Jan-2015 $1,366.75$0.00
Rental201728-Apr-2016 MT-210010586835-EF$1,321.755 BL13-Jan-2015 $1,321.75$0.00
Rental201622-May-2015 MT-210010266072-EF$949.505 BL13-Jan-2015 $949.50$0.00
Rental201529-May-2014 MT-210010178637-EF$12,586.8068 BL01-Apr-2014 $12,586.80$0.00
Rental201417-May-2013 MT-210010109696-EF$9,686.1083 BL09-May-2011 $9,686.10$0.00
Rental201301-Jun-2012 MT-210010046527-EF$9,420.5083 BL09-May-2011 $9,420.50$0.00
Rental201205-May-2011 93642PERTH$894.7483 BL09-May-2011 $9,842.14$0.00
Rental201212-Mar-2010 2334KARRATHA$8,947.40

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$50,000.00false
2020$50,000.0018-Jun-2020 $51,711.00$40,223.00$0.00$0.00$3,455.00$8,033.00$0.00false
2019$50,000.0002-Jul-2019 $108,880.00$104,122.00$0.00$0.00$3,252.00$1,506.00$0.00false
2018$30,000.0004-Jul-2018 $44,292.00$38,347.00$0.00$0.00$1,787.00$4,158.00$0.00false
2017$30,000.0003-Jul-2017 $52,854.00$45,485.00$0.00$0.00$1,370.00$5,999.00$0.00false
2016$20,000.0022-Jun-2016 $6,047.0048911922-Jun-2016 $14,000.00Granted27-Oct-2016 $2,745.00$0.00$0.00$1,038.00$2,264.00$0.00false
2015$46,000.0017-Jun-2015 $46,956.00$26,712.00$0.00$0.00$13,631.00$6,613.00$0.00false
2014$81,750.0024-Jun-2014 $89,606.00$60,942.00$0.00$0.00$12,314.00$16,350.00$0.00false
2013$83,000.0028-Jun-2013 $786,014.00$645,193.00$0.00$0.00$11,782.00$129,039.00$0.00false
2012$83,000.0025-Jun-2012 $94,736.00$55,451.00$0.00$0.00$12,668.00$10,017.00$16,600.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-May-2010 Tenement ApplicationNT Cleared