Tenement Summary

Identifier:E 08/2889-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:115 BL
Purposes:Term:5 Years
Markout:Received:24-Nov-2016 16:16
Commence:18-Jul-2018 Expiry:17-Jul-2023

Holders

Company NameSharesTotal Shares
BARACUS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
BARACUS PTY LTD100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25024-Nov-2016 115.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.18-Jul-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.18-Jul-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.18-Jul-2018
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.18-Jul-2018
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
18-Jul-2018
61No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.18-Jul-2018
71No interference with Geodetic Survey Stations  WYLOO 21, WYLOO 69 to WYLOO 76, WYLOO 76T, WYLOO 140 and TUREE CREEK 2,  and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.18-Jul-2018
81No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.18-Jul-2018
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.18-Jul-2018
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
131Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
141The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.18-Jul-2018
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.18-Jul-2018

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.18-Jul-2018
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.18-Jul-2018
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.18-Jul-2018
41The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.18-Jul-2018
51The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
18-Jul-2018
61No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.18-Jul-2018
71No interference with Geodetic Survey Stations  WYLOO 21, WYLOO 69 to WYLOO 76, WYLOO 76T, WYLOO 140 and TUREE CREEK 2,  and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.18-Jul-2018
81No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.18-Jul-2018
91No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
101No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.18-Jul-2018
111The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
121No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
131Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director, Dangerous Goods and Critical Risks, Safety Regulation, DMIRS.18-Jul-2018
141The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.18-Jul-2018
151Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.18-Jul-2018

Dealings

TypeNumberDetails
Forfeiture564797Initiated:18/10/2019 for non-compliance with reporting requirements( Form 5 )RECORDED:11:21 18 October 2019Notice Issued:Regulation 50 Notice sent 18/10/2019 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:22/11/2019FINALISED:Order by Minister on 11 December 2019 that E 08/2889-I be Penalty Imposed
Fine568583Fine in respect to:Forfeiture Process 564797Fine reason:Non-compliance with expenditure obligationsPenalty amount:$90.00Notification date:16/12/2019Due date:20/01/2020Pursuant to:Section 96A(5)RECORDED:16 December 2019PAYMENT RECEIVED:16 January 2020Receipt Number:10129690Amount:$90.00Remaining balance:$0.00

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202121-Jul-2020 10154790$16,215.00115 BL18-Jul-2018 $16,215.00$0.00
Rental202028-Aug-2019 10112224$15,870.00115 BL18-Jul-2018 $15,870.00$0.00
Rental201924-Nov-2016 68865302873$14,892.50115 BL18-Jul-2018 $14,892.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$115,000.00false
2020$115,000.0018-Sep-2020 $81,262.5058619515-Sep-2020 $55,000.00Recorded$23,375.00$0.00$0.00$44,950.00$12,937.50$0.00false
2019$115,000.0019-Sep-2019 $115,544.00$64,500.00$0.00$0.00$29,444.00$21,600.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
13-Feb-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-03-082017-07-08CLEARED - Expedited Applies2018-07-17115 BL23129S117030E71km W'ly of ParaburdooWO2017/04092017-06-15WC2000/008Objection Dismissed Sec 148(b)2018-05-15WO2017/04082017-06-15WC2000/008Objection Withdrawn No Agreement2018-04-06WO2017/04062017-06-15WC2010/011Objection Withdrawn No Agreement2018-04-06WO2017/04712017-06-26WC2005/004Objection Dismissed Sec 148(b)2018-07-05Jurruru People Part A(WCD2015/002)WC2000/008WAD6007/2000falseWCD2015/002EXISTNoPuutu Kunti Kurrama People and the Pinikura People #1 and #2(WCD2015/003)WC2005/004WAD126/2005falseWCD2015/003BOTHNoYinhawangka Part B(WC2010/011)WC2010/011WAD216/2010falseDeterminedJurruru People(WC2000/008)WC2000/008WAD6007/2000falseNot Accepted12PilbaraYamatji Marlpa Aboriginal Corporation