Cache entry for E 08/2789

Extracted from MTO on 23-Jul-2017 03:34, last changed 06-Jul-2017.

Tenement Summary

Identifier:E 08/2789-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:3 BL
Purposes:Term:5 Years
Markout:Received:06-Nov-2015 08:30
Commence:06-Jul-2016 Expiry:05-Jul-2021

Holders

Company NameCorrespondence AddressSharesTotal Shares
RIO TINTO EXPLORATION PTY LIMITEDC/- RIO TINTO IRON ORE, TENURE MANAGEMENT & STRATEGY GPO BOX A42, PERTH, WA, 6837100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
RIO TINTO EXPLORATION PTY LIMITEDC/- RIO TINTO IRON ORE, TENURE MANAGEMENT & STRATEGY GPO BOX A42, PERTH, WA, 6837100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25006-Nov-2015 3.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Jul-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Jul-2016
31The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-Jul-2016
41The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-Jul-2016
51No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.06-Jul-2016
61No surface excavation approaching closer to the boundary of the Safety Zone established by condition 5 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP.06-Jul-2016
71No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 5 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.06-Jul-2016
81The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 5 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP06-Jul-2016
91No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.06-Jul-2016
101Mining on the Safety Zone established in Condition 5 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .06-Jul-2016
111The rights of ingress to and egress from the pipeline easement established in Condition 5 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.06-Jul-2016
121Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.06-Jul-2016

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Jul-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Jul-2016
31The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-Jul-2016
41The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-Jul-2016
51No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.06-Jul-2016
61No surface excavation approaching closer to the boundary of the Safety Zone established by condition 5 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP.06-Jul-2016
71No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 5 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.06-Jul-2016
81The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 5 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP06-Jul-2016
91No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.06-Jul-2016
101Mining on the Safety Zone established in Condition 5 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .06-Jul-2016
111The rights of ingress to and egress from the pipeline easement established in Condition 5 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.06-Jul-2016
121Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.06-Jul-2016

Dealings

TypeNumberDetails
Iron Ore Inclusion478534Lodged:08:30 06 November 2015RECORDED:10:30 06 November 2015AUTHORISED:11:36:11 06 July 2016

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201812-May-2017 MT-210011052803-EF$388.503 BL06-Jul-2016 $402.00-$13.50
Rental201707-Jul-2016 (REFUND) 531000546202PERTH$1,628.253 BL06-Jul-2016 $375.75$0.00
Rental201706-Nov-2015 531000546202$2,004.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$15,000.00false
2017$15,000.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-Jan-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-02-102016-06-10CLEARED - Expedited Applies2016-06-243 BL2300S11740E66km W'ly of ParabudooPuutu Kunti Kurrama and Pinikura 2(WC2005/004)WC2005/004WAD126/2005trueDetermined12PilbaraYamatji Marlpa Aboriginal Corporation