Cache entry for E 08/2741

Extracted from MTO on 22-Jul-2017 03:35, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 08/2741-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:19 BL
Purposes:Term:5 Years
Markout:Received:24-Jun-2015 12:03
Commence:10-Feb-2016 Expiry:09-Feb-2021

Holders

Company NameCorrespondence AddressSharesTotal Shares
MARDIE MINERALS PTY LTDHETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
MARDIE MINERALS PTY LTDC/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849100100

Shires

Shire NameShire NumberStartArea
KARRATHA CITY431024-Jun-2015 19.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.10-Feb-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.10-Feb-2016
31The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on foreshore, seabed and navigable waters.10-Feb-2016
41No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No. PL17, PL 92, TPL 8 and TPL 13 as shown in TENGRAPH.10-Feb-2016
51No surface excavation approaching closer to the boundary of the Safety Zone established by condition 4 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP10-Feb-2016
61No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 4 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.10-Feb-2016
71The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 4 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP10-Feb-2016
81No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.10-Feb-2016
91Mining on the Safety Zone established in Condition 4 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .10-Feb-2016
101The rights of ingress to and egress from the pipeline easement established in Condition 4 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.10-Feb-2016
111Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.10-Feb-2016

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.10-Feb-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.10-Feb-2016
31The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on foreshore, seabed and navigable waters.10-Feb-2016
41No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No. PL17, PL 92, TPL 8 and TPL 13 as shown in TENGRAPH.10-Feb-2016
51No surface excavation approaching closer to the boundary of the Safety Zone established by condition 4 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP10-Feb-2016
61No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 4 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.10-Feb-2016
71The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 4 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP10-Feb-2016
81No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.10-Feb-2016
91Mining on the Safety Zone established in Condition 4 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .10-Feb-2016
101The rights of ingress to and egress from the pipeline easement established in Condition 4 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.10-Feb-2016
111Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.10-Feb-2016

Dealings

TypeNumberDetails
Iron Ore Inclusion469938Lodged:12:03 24 June 2015RECORDED:12:03 01 September 2015AUTHORISED:00:00 10 February 2016
Application to Amend490144Lodged:10:33:19 07 July 2016Amending:Address (Including DTC Details)From:MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:33:19 07 July 2016

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201807-Feb-2017 MT-210010928322-EF$2,460.5019 BL10-Feb-2016 $2,460.50$0.00
Rental201724-Jun-2015 517514661510$2,319.9019 BL10-Feb-2016 $2,319.90$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$20,000.00false
2017$20,000.0014-Mar-2017 $22,725.83$15,553.61$0.00$0.00$3,172.22$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
07-Sep-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-09-232016-01-23CLEARED - Expedited Applies2016-02-0919 BL21100S1155230E70km NW'ly of PannawonicaWO2015/10542015-12-18WC1996/089Objection Withdrawn Agreement2016-02-09Yaburara & Mardudhunera people(WC1996/089)WC1996/089WAD127/1997trueRegistered12PilbaraYamatji Marlpa Aboriginal Corporation