Extracted from MTO on 16-Jan-2021 04:36,
last changed 15-Jan-2021.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 10-Feb-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-Feb-2016 | |
3 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on foreshore, seabed and navigable waters. | 10-Feb-2016 | |
4 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No. PL17, PL 92, TPL 8 and TPL 13 as shown in TENGRAPH. | 10-Feb-2016 | |
5 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 4 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 10-Feb-2016 | |
6 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 4 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 10-Feb-2016 | |
7 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 4 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 10-Feb-2016 | |
8 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 10-Feb-2016 | |
9 | 1 | Mining on the Safety Zone established in Condition 4 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 10-Feb-2016 | |
10 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 4 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 10-Feb-2016 | |
11 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 10-Feb-2016 | |
12 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 04-Oct-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 10-Feb-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-Feb-2016 | |
3 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on foreshore, seabed and navigable waters. | 10-Feb-2016 | |
4 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No. PL17, PL 92, TPL 8 and TPL 13 as shown in TENGRAPH. | 10-Feb-2016 | |
5 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 4 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 10-Feb-2016 | |
6 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 4 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 10-Feb-2016 | |
7 | 1 | The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 4 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 10-Feb-2016 | |
8 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 10-Feb-2016 | |
9 | 1 | Mining on the Safety Zone established in Condition 4 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 10-Feb-2016 | |
10 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 4 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 10-Feb-2016 | |
11 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 10-Feb-2016 | |
12 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 04-Oct-2019 | |
Type | Number | Details |
Iron Ore Inclusion | 469938 | Lodged:12:03 24 June 2015RECORDED:12:03 01 September 2015AUTHORISED:00:00 10 February 2016 |
Application to Amend | 490144 | Lodged:10:33:19 07 July 2016Amending:Address (Including DTC Details)From:MARDIE MINERALS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:33:19 07 July 2016 |
Conversion | 569545 | New Tenement:M 08/525Application Date:14:20 20 Dec 2019Section:S67 |
Conversion | 569546 | New Tenement:M 08/526Application Date:14:20 20 Dec 2019Section:S67 |
Conversion | 569549 | New Tenement:M 08/528Application Date:14:20 20 Dec 2019Section:S67 |
Conversion | 579882 | New Tenement:G 08/93Application Date:13:31:01 12 Jun 2020Section:S67 |
Application to Amend | 590253 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : MARDIE MINERALS PTY LTD, SAME AS CORRESPONDENCE and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : MARDIE MINERALS PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :MARDIE MINERALS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977RECORDED:14:30 11 November 2020 |
Extension / Renewal of Term | 591597 | Lodged:15:42:27 01 December 2020Applied For Period:5 YearsRECORDED:15:42:27 01 December 2020 |