Cache entry for E 08/2721

Extracted from MTO on 18-Dec-2017 03:35, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 08/2721-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:1 BL
Purposes:Term:5 Years
Markout:Received:06-May-2015 14:23
Commence:14-Jan-2016 Expiry:13-Jan-2021

Holders

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25006-May-2015 1.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.14-Jan-2016
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.14-Jan-2016
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.14-Jan-2016
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.14-Jan-2016

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.14-Jan-2016
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.14-Jan-2016
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.14-Jan-2016
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.14-Jan-2016

Dealings

TypeNumberDetails
Iron Ore Inclusion468457Lodged:15:35 02 June 2015RECORDED:15:35 02 June 2015AUTHORISED:14:47:34 14 January 2016

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201816-Jan-2017 MT-210010901956-DD$311.601 BL14-Jan-2016 $311.60$0.00
Rental201706-May-2015 512616520628$293.701 BL14-Jan-2016 $293.70$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$10,000.00false
2017$10,000.0009-Mar-2017 $10,324.00$7,655.00$0.00$0.00$669.00$2,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
31-Jul-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-08-262015-12-26CLEARED - Expedited Applies2016-01-131 BL224730S1164530E104km NW'ly of ParaburdooPuutu Kunti Kurrama and Pinikura(WC2001/005)WC2001/005WAD6007/2001falseDeterminedPuutu Kunti Kurrama and Pinikura 2(WC2005/004)WC2005/004WAD126/2005falseDetermined12PilbaraYamatji Marlpa Aboriginal Corporation