Cache entry for E 08/2685

Extracted from MTO on 23-Jul-2017 03:34, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 08/2685Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:16 BL
Purposes:Term:5 Years
Markout:Received:20-Jan-2015 08:55
Commence:24-Aug-2015 Expiry:23-Aug-2020

Holders

Company NameCorrespondence AddressSharesTotal Shares
COSMOPOLITAN MINERALS LIMITEDC/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
COSMOPOLITAN MINERALS LIMITEDC/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25020-Jan-2015 11.00000 BL
UPPER GASCOYNE SHIRE847020-Jan-2015 5.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.24-Aug-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.24-Aug-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.24-Aug-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.24-Aug-2015

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.24-Aug-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.24-Aug-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.24-Aug-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.24-Aug-2015

Dealings

TypeNumberDetails
Forfeiture501111Initiated:15/02/2017 for non-compliance with reporting requirementsRECORDED:13:45:02 14 February 2017Notice Issued:Regulation 50 Notice sent 15/02/2017 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:22/03/2017FINALISED:Order by Minister on 27 March 2017 that E 08/2685 be Penalty Imposed
Fine503412Fine in respect to:Forfeiture Process 501111Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$90.00Notification date:28/03/2017Due date:02/05/2017Pursuant to:Section 96A(5)RECORDED:28 March 2017PAYMENT RECEIVED:18 April 2017FINALISED:18 April 2017Receipt Number:06-159885Amount:$90.00Remaining balance:$0.00

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201717-Aug-2016 06-155889PERTH$2,072.0016 BL24-Aug-2015 $2,072.00$0.00
Rental201620-Jan-2015 502011485013$1,953.6016 BL24-Aug-2015 $1,953.60$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2017$20,000.00false
2016$20,000.0019-Oct-2016 $22,085.00$14,987.00$0.00$0.00$3,398.00$3,700.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
11-Mar-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-03-252015-07-25CLEARED - Expedited Applies2015-08-1016 BL23470S1173330E66km S'ly of ParaburdooNHARNUWANGGA WAJARRI AND NGARLAWANGGA(WCD2000/001)WC1999/013WAD72/1998falseWCD2000/00131EXISTYesGobawarrah Minduarra Yinhawanga(WC1997/043)WC1997/043WAD6173/1998falseStruck Out14GeraldtonYamatji Marlpa Aboriginal Corporation11Central DesertCentral Desert Native Title Services