Cache entry for E 08/2662

Extracted from MTO on 19-Dec-2017 03:36, last changed 08-Dec-2017.

Tenement Summary

Identifier:E 08/2662-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:3 BL
Purposes:Term:5 Years
Markout:Received:14-Nov-2014 15:04
Commence:25-Aug-2015 Expiry:24-Aug-2020

Holders

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25014-Nov-2014 3.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.25-Aug-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.25-Aug-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.25-Aug-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.25-Aug-2015
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.25-Aug-2015
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
25-Aug-2015
71No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No  24  as shown in TENGRAPH.25-Aug-2015
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP25-Aug-2015
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.25-Aug-2015
101The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP25-Aug-2015
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.25-Aug-2015
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .25-Aug-2015
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.25-Aug-2015
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.25-Aug-2015
151No activities being carried out within the proposed railway corridor (designated FNA 9198 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.25-Aug-2015
161No interference with Geodetic Survey Station WYLOO 60 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.25-Aug-2015

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.25-Aug-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.25-Aug-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.25-Aug-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.25-Aug-2015
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.25-Aug-2015
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
25-Aug-2015
71No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No  24  as shown in TENGRAPH.25-Aug-2015
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP25-Aug-2015
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.25-Aug-2015
101The licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP25-Aug-2015
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.25-Aug-2015
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .25-Aug-2015
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.25-Aug-2015
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.25-Aug-2015
151No activities being carried out within the proposed railway corridor (designated FNA 9198 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.25-Aug-2015
161No interference with Geodetic Survey Station WYLOO 60 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.25-Aug-2015

Dealings

TypeNumberDetails
Iron Ore Inclusion458480Lodged:14:00 01 December 2014RECORDED:14:00 01 December 2014AUTHORISED:14:35:17 01 December 2014

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201825-Aug-2017 7979761637$402.003 BL25-Aug-2015 $402.00$0.00
Rental201725-Aug-2016 MT-210010720104-DD$388.503 BL25-Aug-2015 $388.50$0.00
Rental201614-Nov-2014 431818345760$366.303 BL25-Aug-2015 $366.30$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$15,000.00false
2017$15,000.0018-Oct-2017 $6,219.0051659818-Oct-2017 $15,000.00Granted07-Dec-2017 $4,705.00$0.00$0.00$1,314.00$200.00$0.00false
2016$15,000.0012-Oct-2016 $8,639.0049526212-Oct-2016 $15,000.00Granted02-Dec-2016 $5,273.00$0.00$0.00$366.00$3,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
13-Mar-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-04-082015-08-08CLEARED - Expedited Applies2015-08-243 BL22490S116360E118km W'ly of ParaburdooPuutu Kunti Kurrama and Pinikura(WC2001/005)WC2001/005WAD6007/2001trueDetermined12PilbaraYamatji Marlpa Aboriginal Corporation