Cache entry for E 08/2571

Extracted from MTO on 24-Oct-2017 03:36, last changed 24-Oct-2017.

Tenement Summary

Identifier:E 08/2571Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:66 BL
Purposes:Term:5 Years
Markout:Received:11-Dec-2013 08:30
Commence:22-May-2015 Expiry:21-May-2020

Holders

Company NameCorrespondence AddressSharesTotal Shares
METAL HOLDINGS PTY LTDHETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
METAL HOLDINGS PTY LTDC/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Special ProspectingP 08/693-SDead
Special ProspectingP 08/694-SDead
Special ProspectingP 08/695-SDead

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25011-Dec-2013 66.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.22-May-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.22-May-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.22-May-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-May-2015
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.22-May-2015
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
22-May-2015
71No interference with Geodetic Survey Station SSM-YANREY 50 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.22-May-2015
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.22-May-2015

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.22-May-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.22-May-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.22-May-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-May-2015
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.22-May-2015
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
22-May-2015
71No interference with Geodetic Survey Station SSM-YANREY 50 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.22-May-2015
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.22-May-2015

Dealings

TypeNumberDetails
Application to Amend490146Lodged:10:36:54 07 July 2016Amending:Address (Including DTC Details)From:METAL HOLDINGS PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:METAL HOLDINGS PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:36:54 07 July 2016

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201815-May-2017 MT-210011063077-EF$8,547.0066 BL22-May-2015 $8,547.00$0.00
Rental201716-May-2016 MT-210010604952-EF$8,266.5066 BL22-May-2015 $8,266.50$0.00
Rental201611-Dec-2013 334504587925$7,854.0066 BL22-May-2015 $7,854.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$66,000.00false
2017$66,000.0030-Jun-2017 $105,293.46$42,579.70$0.00$33,343.20$16,170.56$13,200.00$0.00false
2016$66,000.0007-Jul-2016 $66,770.96$37,244.14$0.00$0.00$16,326.82$13,200.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
27-Feb-2014 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2014-03-262014-07-26CLEARED - Expedited Applies2015-05-2266 BL22570S1151929E147km S'ly of OnslowWO2014/02342014-04-02WC2004/005Objection Withdrawn No Agreement2015-03-03WO2014/03032014-05-08WC1999/045Objection Withdrawn Agreement2015-05-20THALANYJI(WCD2008/003)WC1999/045WAD6113/1998falseWCD2008/003116EXISTNoBudina People(WC2004/005)WC2004/005WAD131/2004falseDetermined12PilbaraYamatji Marlpa Aboriginal Corporation