Cache entry for E 08/2514

Extracted from MTO on 21-Jul-2017 03:35, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 08/2514-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:ONLINEArea:61 BL
Purposes:Term:5 Years
Markout:Received:07-Aug-2013 09:51
Commence:12-Mar-2014 Expiry:11-Mar-2019

Holders

Company NameCorrespondence AddressSharesTotal Shares
BHP BILLITON MINERALS PTY LTDWAIO LAND TENURE, C/- LAND TENURE TEAM, PO BOX 7474 CLOISTERS SQUARE, PERTH, WA, 6850, xxxxxxxxxxxxxxxxxx@bhpbilliton.com100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
BHP BILLITON MINERALS PTY LTDC/- LAND TENURE TEAM - WAIO, BHP BILLITON IRON ORE PTY LTD, PO BOX 7474, CLOISTERS SQUARE, PERTH, WA, 6850100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847007-Aug-2013 61.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.12-Mar-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Mar-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Mar-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Mar-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Mar-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Mar-2014
71No interference with Geodetic Survey Station SSM-NMF 562 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Mar-2014
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.12-Mar-2014
91Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface.12-Mar-2014
101No interference with the Australian Telecommunications Commission microwave repeater station ray-line.12-Mar-2014

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.12-Mar-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.12-Mar-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.12-Mar-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Mar-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.12-Mar-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
12-Mar-2014
71No interference with Geodetic Survey Station SSM-NMF 562 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.12-Mar-2014
81No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.12-Mar-2014
91Mining within a radius of 150 metres of any Australian Telecommunications Commission microwave repeater station being confined to below a depth of 60 metres from the natural surface.12-Mar-2014
101No interference with the Australian Telecommunications Commission microwave repeater station ray-line.12-Mar-2014

Dealings

TypeNumberDetails
Application to Amend495704Lodged:08:30 18 October 2016Amending:Address (Including DTC Details)From:BHP BILLITON MINERALS PTY LTD, C/- LAND TENURE TEAM - WAIO, BHP BILLITON IRON ORE PTY LTD, PO BOX 7474, CLOISTERS SQUARE, PERTH, WA, 6850To:BHP BILLITON MINERALS PTY LTD, WAIO LAND TENURE, C/- LAND TENURE TEAM, PO BOX 7474 CLOISTERS SQUARE, PERTH, WA, 6850, xxxxxxxxxxxxxxxxxx@bhpbilliton.comRECORDED:08:30 18 October 2016

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201817-Jan-2017 06-158300PERTH$12,288.4561 BL12-Mar-2014 $12,288.45$0.00
Rental201702-Feb-2016 06-151607PERTH$7,640.2561 BL12-Mar-2014 $7,640.25$0.00
Rental201630-Jan-2015 06-142484PERTH$7,448.1061 BL12-Mar-2014 $7,448.10$0.00
Rental201507-Aug-2013 321911190072$7,259.0061 BL12-Mar-2014 $7,259.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$91,500.00false
2017$61,000.0028-Feb-2017 $83,114.00$72,365.00$0.00$0.00$10,249.00$500.00$0.00false
2016$61,000.0023-Mar-2016 $76,185.59$46,574.42$0.00$18,686.49$10,424.68$500.00$0.00false
2015$61,000.0017-Feb-2015 $71,179.00$61,061.00$0.00$0.00$9,618.00$500.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
26-Sep-2013 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2013-10-232014-02-23CLEARED - Expedited Applies2014-03-1161 BL235729S117330E85km S'ly of ParaburdooNHARNUWANGGA WAJARRI AND NGARLAWANGGA(WCD2000/001)WC1999/013WAD72/1998falseWCD2000/00131EXISTYes14GeraldtonYamatji Marlpa Aboriginal Corporation