Cache entry for E 08/2251

Extracted from MTO on 23-Jul-2017 03:34, last changed 11-Jul-2017.

Tenement Summary

Identifier:E 08/2251Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:1 BL
Purposes:Term:5 Years
Markout:Received:01-Mar-2011 15:53
Commence:11-Jun-2012 Expiry:10-Jun-2017

Holders

Company NameCorrespondence AddressSharesTotal Shares
NORTHERN STAR RESOURCES LTDC/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
NORTHERN STAR RESOURCES LTDC/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Amalgamation (Same Holder)Amalgamation 462005GrantedP 08/516Dead

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25001-Mar-2011 1.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.11-Jun-2012
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.11-Jun-2012
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.11-Jun-2012
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.11-Jun-2012
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.11-Jun-2012
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
11-Jun-2012

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.11-Jun-2012
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.11-Jun-2012
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.11-Jun-2012
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.11-Jun-2012
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.11-Jun-2012
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
11-Jun-2012

Dealings

TypeNumberDetails
ObjectionKR237/101Lodged:15:58 22 March 2011Objectors:PUUTU KURNTI KURRAMA PINIKURA NATIVE TITLE CLAIMObjection Type:Tenement ApplicationRECORDED:15:58 22 March 2011WITHDRAWN:09:30 30 September 2011
Mortgage440185Lodged:12:10 10 February 2014Mortgaged Shares:100/100 shares NORTHERN STAR RESOURCES LTDMortgagee:INVESTEC BANK (AUSTRALIA) LTDREGISTERED:12:10 10 February 2014DISCHARGED:11:55 31 July 2014Full Discharge:451863 Registered 11:55 31 July 2014
Mortgage - Discharge451863Lodged:11:55 31 July 2014In respect to:Mortgage 440185REGISTERED:11:55 31 July 2014
Amalgamation462005Lodged:15:45 06 February 2015Amalgamating:Portion of P 08/516Situated within:External boundaries of E 08/2251Granted 21/07/2015 in respect to P 08/516
Application to Amend476104Lodged:15:29:07 19 October 2015Amending:AddressFrom:NORTHERN STAR RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:15:29:07 19 October 2015
Extension / Renewal of Term506531Lodged:08:30 18 May 2017Applied For Period:5 YearsRECORDED:08:30 18 May 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201816-May-2017 MT-210011070012-DD$311.601 BL11-Jun-2012 $311.60$0.00
Rental201712-May-2016 MT-210010600867-DD$301.351 BL11-Jun-2012 $301.35$0.00
Rental201613-Jul-2015 MT-210010309590-DD$293.701 BL11-Jun-2012 $293.70$0.00
Rental201523-May-2014 MT-210010180133-DD$286.251 BL11-Jun-2012 $286.25$0.00
Rental201429-May-2013 MT-210010109196-EF$280.651 BL11-Jun-2012 $280.65$0.00
Rental201301-Mar-2011 3559KARRATHA$265.201 BL11-Jun-2012 $265.20$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$15,000.00false
2017$10,000.0010-Jul-2017 $5,005.0051011610-Jul-2017 $4,995.00Recorded$2,540.00$0.00$0.00$1,226.00$1,239.00$0.00false
2016$10,000.0013-Jul-2016 $9,680.0049068815-Jul-2016 $320.00Granted07-Sep-2016 $6,574.00$0.00$0.00$1,106.00$2,000.00$0.00false
2015$10,000.0014-Jul-2015 $17,455.00$13,701.00$0.00$0.00$845.00$2,909.00$0.00false
2014$10,000.0022-Jul-2014 $8,969.0045133323-Jul-2014 $10,000.00Granted28-Apr-2015 $6,132.00$0.00$0.00$837.00$2,000.00$0.00false
2013$10,000.0006-Aug-2013 $13,578.00$10,369.00$0.00$0.00$946.00$2,263.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
11-Feb-2015 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-02-252015-06-25CLEARED - Expedited Applies2015-07-0748.18 HA222930S116920E96km S'ly of PannawonicaPuutu Kunti Kurrama and Pinikura(WC2001/005)WC2001/005WAD6007/2001trueDetermined12PilbaraYamatji Marlpa Aboriginal Corporation
26-Oct-2011 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2011-12-142012-04-14CLEARED - Expedited Applies2012-06-051 BL222929S116930E96km S'ly of PannawonicaPuutu Kunti Kurrama and Pinikura(WC2001/005)WC2001/005WAD6007/2001trueDetermined12PilbaraYamatji Marlpa Aboriginal Corporation