Cache entry for E 08/2248

Extracted from MTO on 22-Oct-2017 03:35, last changed 03-Oct-2017.

Tenement Summary

Identifier:E 08/2248Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:16 BL
Purposes:Term:5 Years
Markout:Received:23-Feb-2011 16:22
Commence:30-Nov-2012 Expiry:29-Nov-2017

Holders

Company NameCorrespondence AddressSharesTotal Shares
COCCINELLA PTY LTDC/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
COCCINELLA PTY LTDC/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25023-Feb-2011 16.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.30-Nov-2012
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.30-Nov-2012
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.30-Nov-2012
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.30-Nov-2012
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.30-Nov-2012
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
30-Nov-2012
71No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
30-Nov-2012
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP30-Nov-2012
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.30-Nov-2012
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP30-Nov-2012
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer DMP.30-Nov-2012
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .30-Nov-2012
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.30-Nov-2012
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.30-Nov-2012
151No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.30-Nov-2012

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.30-Nov-2012
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.30-Nov-2012
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.30-Nov-2012
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.30-Nov-2012
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.30-Nov-2012
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
30-Nov-2012
71No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
30-Nov-2012
81No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP30-Nov-2012
91No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.30-Nov-2012
101The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP30-Nov-2012
111No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer DMP.30-Nov-2012
121Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .30-Nov-2012
131The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.30-Nov-2012
141Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.30-Nov-2012
151No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface.30-Nov-2012

Dealings

TypeNumberDetails
Application to Amend381971Lodged:11:31 20 September 2011Amending:AddressFrom:COCCINELLA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:COCCINELLA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:11:31 20 September 2011
Extension of Time480027Lodged:13:08 11 January 2016Type:Stat DecRECORDED:13:08 11 January 2016APPROVED:15:30:04 11 January 2016Time extended to 10 February 2016
Forfeiture488035Initiated:31/05/2016 for non-compliance with expenditure conditionsRECORDED:15:30 31 May 2016Notice Issued:Regulation 50 Notice sent 31/05/2016 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:30/06/2016FINALISED:Order by Minister on 13 June 2016 that E 08/2248 be Penalty Imposed
Fine488692Fine in respect to:Forfeiture Process 488035Fine reason:Non-compliance with expenditure obligationsPenalty amount:$838.00Notification date:16/06/2016Due date:21/07/2016Pursuant to:Section 96A(5)RECORDED:16 June 2016PAYMENT RECEIVED:16 June 2016Receipt Number:06-154559Amount:$838.00Remaining balance:$0.00FINALISED:16 June 2016
Extension / Renewal of Term515421Lodged:14:49:41 29 September 2017Applied For Period:5 YearsRECORDED:14:49:41 29 September 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201829-Sep-2017 77324683842$4,528.0016 BL30-Nov-2012 $4,528.00$0.00
Rental201729-Nov-2016 06-157686PERTH$3,223.2016 BL30-Nov-2012 $3,223.20$0.00
Rental201627-Nov-2015 06-150357PERTH$3,117.6016 BL30-Nov-2012 $3,117.60$0.00
Rental201513-Nov-2014 06-140612PERTH$1,953.6016 BL30-Nov-2012 $1,953.60$0.00
Rental201419-Nov-2013 06-130646PERTH$1,904.0016 BL30-Nov-2012 $1,904.00$0.00
Rental201323-Feb-2011 3538KARRATHA$1,761.6016 BL30-Nov-2012 $1,761.60$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2017$30,000.00false
2016$30,000.0023-Jan-2017 $364,245.00$271,718.00$0.00$26,780.00$5,040.00$60,707.00$0.00false
2015$20,000.0009-Dec-2015 $11,612.0047904116-Dec-2015 $20,000.00Refused31-May-2016 $6,503.00$0.00$0.00$3,710.00$1,399.00$0.00false
2014$20,000.0031-Dec-2014 $26,526.00$18,604.00$0.00$0.00$3,501.00$4,421.00$0.00false
2013$20,000.0007-Jan-2014 $22,971.00$16,350.00$0.00$0.00$2,621.00$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
27-Jul-2011 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2011-11-162012-03-16CLEARED - Expedited Applies2012-11-2816 BL23729S1171729E40km W'ly of ParaburdooWO12/2172012-04-19WC2010/016Objection Withdrawn Agreement2012-11-27WO12/2222012-04-19WC2010/011Objection Withdrawn Agreement2012-11-27Yinhawangka Part B(WC2010/011)WC2010/011WAD216/2010falseDeterminedYinhawangka Part A(WC2010/016)WC2010/016WAD340/2010falseDetermined12PilbaraYamatji Marlpa Aboriginal Corporation