Cache entry for E 08/2067

Extracted from MTO on 19-Oct-2017 03:39, last changed 07-Oct-2017.

Tenement Summary

Identifier:E 08/2067-IType:Exploration Licence
Status:DeadDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:8 BL
Purposes:Term:5 Years
Markout:Received:21-Sep-2009 14:31
Commence:29-May-2012 Expiry:28-May-2017

Holders

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDC/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDC/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25021-Sep-2009 8.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.29-May-2012
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.29-May-2012
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-May-2012
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-May-2012
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-May-2012
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-May-2012
71The rights of ingress to and egress from Miscellaneous Licence 08/14 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.29-May-2012
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Quarry Reserve 37596.29-May-2012
91No interference with Geodetic Survey Station PW 4 & 4T, WYL 130, 131, 132 & 136, WYLOO 15, 15T & 48 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.29-May-2012
101No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.
29-May-2012
111No surface excavation approaching closer to the boundary of the Safety Zone established by condition 10 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP29-May-2012
121No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 10 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.29-May-2012
131The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 10 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP29-May-2012
141No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.29-May-2012
151Mining on the Safety Zone established in Condition 10 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .29-May-2012
161The rights of ingress to and egress from the pipeline easement established in Condition 10 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.29-May-2012
171Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.29-May-2012
181No activities being carried out within the proposed railway corridor (designated FNA 9018 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.29-May-2012

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.29-May-2012
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.29-May-2012
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-May-2012
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-May-2012
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-May-2012
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-May-2012
71The rights of ingress to and egress from Miscellaneous Licence 08/14 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.29-May-2012
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Quarry Reserve 37596.29-May-2012
91No interference with Geodetic Survey Station PW 4 & 4T, WYL 130, 131, 132 & 136, WYLOO 15, 15T & 48 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.29-May-2012
101No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No 24 as shown in TENGRAPH.
29-May-2012
111No surface excavation approaching closer to the boundary of the Safety Zone established by condition 10 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP29-May-2012
121No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 10 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.29-May-2012
131The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 10 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP29-May-2012
141No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.29-May-2012
151Mining on the Safety Zone established in Condition 10 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .29-May-2012
161The rights of ingress to and egress from the pipeline easement established in Condition 10 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.29-May-2012
171Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.29-May-2012
181No activities being carried out within the proposed railway corridor (designated FNA 9018 ) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.29-May-2012

Dealings

TypeNumberDetails
Iron Ore Inclusion331962Lodged:11:01 30 September 2009RECORDED:11:01 30 September 2009AUTHORISED:00:00 29 May 2012
ObjectionKR82/090Lodged:14:57 21 October 2009Objectors:APPLICANTS FOR THE PUUTU KURNTI KURRAMA PINIKURA NATIVE TITLE CLAIMObjection Type:Tenement ApplicationRECORDED:14:57 21 October 2009WITHDRAWN:10:00 08 October 2010
ObjectionKR86/090Lodged:11:53 23 October 2009Objectors:INTREPID MINES LTDObjection Type:Tenement ApplicationRECORDED:11:53 23 October 2009FINALISED:09:25 05 November 2010Wardens Decision Made on:09:25 05 November 2010Wardens Decision Status:FinalisedWardens Decision Text:Objection finalised on Warden Roth M's Recommendation for Grant of E08/2067 including agreed conditions stated in Minute of Programming Directions Sought by Consent dated 28 January, 2010.
Application to Amend395606Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013
Application to Amend420704Lodged:16:10 10 April 2013Amending:AddressFrom:Residential : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and Correspondence :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Residential : FMG PILBARA PTY LTD, ADDRESS NOT PROVIDED and Correspondence :FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:10 10 April 2013
Application to Amend476089Lodged:14:51:26 19 October 2015Amending:AddressFrom:FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:FMG PILBARA PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:14:51:26 19 October 2015
Extension / Renewal of Term505917Lodged:10:24:45 08 May 2017Applied For Period:5 YearsRECORDED:10:24:45 08 May 2017REFUSED:27 September 2017Licence Expired:27/09/2017
Expiry - Full515328EFFECTIVE:Midnight 27 September 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201828-Sep-2017 (REFUND) MT-210011053924-DDPERTH$1,275.638 BL29-May-2012 $911.17$0.00
Rental201805-May-2017 MT-210011053924-DD$2,186.80
Rental201729-Apr-2016 MT-210010587890-DD$1,558.808 BL29-May-2012 $1,558.80$0.00
Rental201604-May-2015 MT-210010254543-DD$1,519.208 BL29-May-2012 $1,519.20$0.00
Rental201513-May-2014 MT-210010178215-DD$952.008 BL29-May-2012 $952.00$0.00
Rental201422-May-2013 06-124207PERTH$933.608 BL29-May-2012 $933.60$0.00
Rental201330-May-2012 (REFUND) 1754KARRATHA$754.608 BL29-May-2012 $862.40$0.00
Rental201321-Sep-2009 1754KARRATHA$1,617.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$16,667.00false
2017$30,000.0020-Jun-2017 $3,559.0050863720-Jun-2017 $26,441.00Granted14-Aug-2017 $0.00$0.00$0.00$2,517.00$1,042.00$0.00false
2016$30,000.0018-Jul-2016 $3,789.0049082519-Jul-2016 $26,112.00Granted22-Sep-2016 $770.00$0.00$0.00$1,519.00$1,500.00$0.00false
2015$20,000.0016-Jun-2015 $85,822.00$70,670.00$0.00$0.00$952.00$14,200.00$0.00false
2014$20,000.0024-Jun-2014 $27,956.00$21,565.00$0.00$0.00$1,732.00$4,659.00$0.00false
2013$20,000.0009-Jul-2013 $13,968.0042694910-Jul-2013 $20,000.00Granted16-Sep-2013 $8,260.00$0.00$0.00$1,708.00$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
30-Jun-2011 Tenement ApplicationNT Cleared