Cache entry for E 08/2000

Extracted from MTO on 23-Jul-2017 03:36, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 08/2000-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:19 BL
Purposes:Term:5 Years (Extended)
Markout:Received:06-May-2009 09:47
Commence:16-Dec-2011 Expiry:15-Dec-2021

Holders

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDC/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
FMG PILBARA PTY LTDC/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25006-May-2009 19.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.16-Dec-2011
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.16-Dec-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.16-Dec-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.16-Dec-2011
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.16-Dec-2011
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
16-Dec-2011
71The rights of ingress to and egress from Miscellaneous Licence 08/14 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.16-Dec-2011
81No interference with Geodetic Survey Stations Wyloo 3, Wyloo 4, Wyloo 5, WYL 127, WYL 128 and WYL 129 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.16-Dec-2011
91No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
16-Dec-2011
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP16-Dec-2011
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.16-Dec-2011
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP16-Dec-2011
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.16-Dec-2011
141Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .16-Dec-2011
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.16-Dec-2011
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.16-Dec-2011

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.16-Dec-2011
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.16-Dec-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.16-Dec-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.16-Dec-2011
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.16-Dec-2011
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
16-Dec-2011
71The rights of ingress to and egress from Miscellaneous Licence 08/14 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.16-Dec-2011
81No interference with Geodetic Survey Stations Wyloo 3, Wyloo 4, Wyloo 5, WYL 127, WYL 128 and WYL 129 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.16-Dec-2011
91No mining within 25 metres of either side of the Dampier to Perth Gas/Petroleum pipeline as shown in TENGRAPH.
16-Dec-2011
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP16-Dec-2011
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.16-Dec-2011
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP16-Dec-2011
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP.16-Dec-2011
141Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP .16-Dec-2011
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.16-Dec-2011
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.16-Dec-2011

Dealings

TypeNumberDetails
ObjectionKR500/089Lodged:11:12 11 May 2009Objectors:INTREPID MINES LTDObjection Type:Tenement ApplicationRECORDED:11:12 11 May 2009WITHDRAWN:10:00 05 October 2010
Iron Ore Inclusion321630Lodged:11:09 22 May 2009RECORDED:11:09 22 May 2009AUTHORISED:00:00 16 December 2011
Extension of Time421449Lodged:17:15 08 March 2013Type:Stat DecRECORDED:17:15 08 March 2013Extension of time until 15 March 2013 to lodge statutory declaration in support of Appln 416701 for exemption from expenditure condition for the year ending 15 December 2012APPROVED:13:57:53 22 April 2013
Application to Amend395606Lodged:15:45 11 March 2013Amending:AddressFrom:FMG PILBARA PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004To:FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:45 11 March 2013
Application to Amend420704Lodged:16:10 10 April 2013Amending:AddressFrom:Residential : FMG PILBARA PTY LTD, SAME AS CORRESPONDENCE and Correspondence :FMG PILBARA PTY LTD, ACQUISITIONS AND TENEMENTS DEPARTMENT, PO BOX 3379 HAY STREET, EAST PERTH, WA, 6004To:Residential : FMG PILBARA PTY LTD, ADDRESS NOT PROVIDED and Correspondence :FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:10 10 April 2013
Application to Amend476089Lodged:14:51:26 19 October 2015Amending:AddressFrom:FMG PILBARA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:FMG PILBARA PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:14:51:26 19 October 2015
Extension / Renewal of Term497012Lodged:13:36:49 16 November 2016Applied For Period:5 YearsRECORDED:13:36:49 16 November 2016GRANTED:30 January 2017Granted Period:5 YearsTerm Extended To:15/12/2021

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201708-Dec-2016 MT-210010854601-DD$5,193.6519 BL16-Dec-2011 $5,193.65$0.00
Rental201613-Nov-2015 MT-210010429260-DD$3,702.1519 BL16-Dec-2011 $3,702.15$0.00
Rental201518-Nov-2014 MT-210010216938-DD$3,608.1019 BL16-Dec-2011 $3,608.10$0.00
Rental201426-Nov-2013 MT-210010146524-DD$2,261.0019 BL16-Dec-2011 $2,261.00$0.00
Rental201318-Dec-2012 06-118702PERTH$2,217.3019 BL16-Dec-2011 $2,217.30$0.00
Rental201206-May-2009 1197KARRATHA$1,966.5019 BL16-Dec-2011 $1,966.50$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2017$50,000.00false
2016$30,000.0013-Jan-2017 $35,848.00$26,871.00$0.00$0.00$5,977.00$3,000.00$0.00false
2015$30,000.0025-Jan-2016 $60,214.00$50,158.00$0.00$0.00$4,056.00$6,000.00$0.00false
2014$20,000.0019-Jan-2015 $97,243.00$87,110.00$0.00$0.00$6,133.00$4,000.00$0.00false
2013$20,000.0021-Jan-2014 $61,718.00$48,863.00$0.00$0.00$2,569.00$10,286.00$0.00false
2012$20,000.0008-Feb-2013 $16,449.0041670108-Feb-2013 $20,000.00Granted07-May-2013 $7,965.00$0.00$0.00$4,484.00$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
16-Jun-2011 Tenement ApplicationNT Cleared