Cache entry for E 08/1852

Extracted from MTO on 22-Oct-2017 03:35, last changed 17-Aug-2017.

Tenement Summary

Identifier:E 08/1852Type:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:4 BL
Purposes:Term:5 Years (Extended)
Markout:Received:01-Apr-2008 10:55
Commence:22-Jun-2009 Expiry:21-Jun-2019

Holders

Company NameCorrespondence AddressSharesTotal Shares
HEALD, NigelUNIT 8, 2 CORANDER GARDENS, CARINE, WA, 60209696

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
HEALD, NigelUNIT 8, 2 CORANDER GARDENS, CARINE, WA, 60209696

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25001-Apr-2008 4.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.22-Jun-2009
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.22-Jun-2009
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.22-Jun-2009
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-Jun-2009
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.22-Jun-2009
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
22-Jun-2009
71In respect of the area covered by this licence if the Jurruru People (being the applicants in Federal Court Application No/s. WC00/008 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Jurruru People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Central Dessert.22-Jun-2009
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work on E08/1852 for Nigel Heald (Reg ID 24224) dated 12 October 2009 signed by Nigel Heald and retained on Department of Mines and Petroleum File No. T1378/200801.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
08-Dec-2009
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.08-Dec-2009
101All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.08-Dec-2009
112The Licensee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • November.
03-Sep-2013 28-Mar-2014
111The Licensee submitting to the Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • November.
08-Dec-2009 02-Sep-2013

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.22-Jun-2009
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.22-Jun-2009
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.22-Jun-2009
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.22-Jun-2009
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.22-Jun-2009
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
22-Jun-2009
71In respect of the area covered by this licence if the Jurruru People (being the applicants in Federal Court Application No/s. WC00/008 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Jurruru People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Central Dessert.22-Jun-2009
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of Work on E08/1852 for Nigel Heald (Reg ID 24224) dated 12 October 2009 signed by Nigel Heald and retained on Department of Mines and Petroleum File No. T1378/200801.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
08-Dec-2009
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.08-Dec-2009
101All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.08-Dec-2009
112The Licensee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • November.
03-Sep-2013 28-Mar-2014
111The Licensee submitting to the Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • November.
08-Dec-2009 02-Sep-2013

Dealings

TypeNumberDetails
Excess Tonnage332559Lodged:09:30 13 October 2009for an additional 4,900 tonnes.RECORDED:09:30 13 October 2009GRANTED:09:55:16 16 November 2009
Excess Tonnage339549Lodged:11:30 28 January 2010for a further 5,100 tonnesRECORDED:11:30 28 January 2010GRANTED:14:00 02 February 2010
Extension / Renewal of Term448448Lodged:15:30 09 June 2014Applied For Period:5 YearsRECORDED:15:30 09 June 2014GRANTED:16 July 2014Granted Period:5 YearsTerm Extended To:21/06/2019

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201817-Jul-2017 01-030448KALGOORLIE$2,070.404 BL22-Jun-2009 $2,070.40$0.00
Rental201720-Jul-2016 01-028951KALGOORLIE$2,002.404 BL22-Jun-2009 $2,002.40$0.00
Rental201619-May-2015 27265KALGOORLIE$1,030.604 BL22-Jun-2009 $1,030.60$0.00
Rental201509-Jun-2014 25904KALGOORLIE$1,004.404 BL22-Jun-2009 $1,004.40$0.00
Rental201410-Jun-2013 024343KALGOORLIE$725.804 BL22-Jun-2009 $725.80$0.00
Rental201328-May-2012 22130KALGOORLIE$706.004 BL22-Jun-2009 $706.00$0.00
Rental201207-Jun-2011 19505KALGOORLIE$484.444 BL22-Jun-2009 $484.44$0.00
Rental201118-May-2010 16120KALGOORLIE$474.324 BL22-Jun-2009 $474.32$0.00
Rental201012-Jun-2009 13006KALGOORLIE$40.054 BL22-Jun-2009 $440.44$0.01
Rental201001-Apr-2008 101KARRATHA$400.40

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$50,000.00false
2017$50,000.0015-Aug-2017 $67,255.00$0.00$0.00$0.00$0.00$0.00$67,255.00false
2016$30,000.0011-Aug-2016 $60,298.00$0.00$0.00$0.00$2,002.00$1,200.00$57,096.00false
2015$30,000.0006-Aug-2015 $36,167.00$0.00$0.00$0.00$0.00$0.00$36,167.00false
2014$20,000.0025-Jun-2014 $58,208.00$0.00$0.00$0.00$0.00$0.00$58,208.00false
2013$20,000.0010-Jul-2013 $49,896.00$0.00$0.00$0.00$0.00$0.00$49,896.00false
2012$15,000.0002-Jul-2012 $27,849.00$0.00$0.00$0.00$0.00$0.00$27,849.00false
2011$15,000.0024-Jun-2011 $26,439.00$0.00$0.00$0.00$0.00$0.00$26,439.00false
2010$15,000.0002-Jul-2010 $31,079.00$0.00$0.00$0.00$0.00$0.00$31,079.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-Jul-2008 Tenement ApplicationNT Cleared