Cache entry for E 08/1825

Extracted from MTO on 24-Oct-2017 03:35, last changed 23-Oct-2017.

Tenement Summary

Identifier:E 08/1825-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:5 BL
Purposes:Term:5 Years (Extended)
Markout:Received:27-Jul-2007 10:52
Commence:23-Oct-2009 Expiry:22-Oct-2019

Holders

Company NameCorrespondence AddressSharesTotal Shares
ZANTHUS RESOURCES PTY LTDP.O. BOX Z5183, ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxx@coziron.com, xxxxx09985100
ZANF PTY LTDC/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 600815100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
BUSHWIN PTY LTDPO BOX 1760, WEST PERTH, WA, 6872100100

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25027-Jul-2007 3.25000 BL
KARRATHA CITY431027-Jul-2007 1.75000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.23-Oct-2009
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.23-Oct-2009
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.23-Oct-2009
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.23-Oct-2009
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.23-Oct-2009
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
23-Oct-2009
71In respect of the area covered by this licence if the Kururma Marthudunera People (being the applicants in Federal Court Application No/s. WC99/012 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Kurama Marthudunera People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatje Marlpa Aboriginal Corporation.23-Oct-2009

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.23-Oct-2009
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.23-Oct-2009
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.23-Oct-2009
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.23-Oct-2009
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.23-Oct-2009
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
23-Oct-2009
71In respect of the area covered by this licence if the Kururma Marthudunera People (being the applicants in Federal Court Application No/s. WC99/012 send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Kurama Marthudunera People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatje Marlpa Aboriginal Corporation.23-Oct-2009

Dealings

TypeNumberDetails
Application to Amend367539Lodged:16:15 11 March 2011Amending:AddressFrom:ZANTHUS RESOURCES PTY LTD, C/- STATEWIDE TENEMENT & ADVISORY SERVICES PTY LTD, PO BOX 8095 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:ZANTHUS RESOURCES PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:16:15 11 March 2011
Application to Amend413490Lodged:14:00 18 December 2012Amending:AddressFrom:ZANTHUS RESOURCES PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:ZANTHUS RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:00 18 December 2012
Extension / Renewal of Term456259Lodged:15:30 15 October 2014Applied For Period:5 YearsRECORDED:15:30 15 October 2014GRANTED:03 February 2015Granted Period:5 YearsTerm Extended To:22/10/2019
Application to Amend504259Lodged:15:48:42 10 April 2017Amending:Address (Including DTC Details)From:Principal Place of Business : ZANTHUS RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :ZANTHUS RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : ZANTHUS RESOURCES PTY LTD, ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxx@coziron.com, xxxxx099 and DTC :ZANTHUS RESOURCES PTY LTD, P.O. BOX Z5183, ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxx@coziron.com, xxxxx099RECORDED:15:48:42 10 April 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental20185 BL23-Oct-2009 $2,675.00-$2,675.00
Rental201721-Oct-2016 MT-210010744540-EF$2,588.005 BL23-Oct-2009 $2,588.00$0.00
Rental201620-Oct-2015 MT-210010373847-EF$1,321.755 BL23-Oct-2009 $1,321.75$0.00
Rental201514-Oct-2014 MT-210010206429-EF$1,288.255 BL23-Oct-2009 $1,288.25$0.00
Rental201419-Sep-2013 MT-210010134273-EF$925.505 BL23-Oct-2009 $925.50$0.00
Rental201309-Oct-2012 06-115891PERTH$907.255 BL23-Oct-2009 $907.25$0.00
Rental201214-Nov-2011 102588PERTH$567.505 BL23-Oct-2009 $567.50$0.00
Rental201115-Nov-2010 86677PERTH$605.555 BL23-Oct-2009 $605.55$0.00
Rental201018-Aug-2009 68579PERTH$50.055 BL23-Oct-2009 $550.55$0.00
Rental201027-Jul-2007 3095KARRATHA$500.50

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$50,000.00false
2017$50,000.00false
2016$30,000.0008-Nov-2016 $13,503.0649677711-Nov-2016 $30,000.00Granted28-Dec-2016 $3,650.00$0.00$0.00$3,853.06$6,000.00$0.00false
2015$30,000.0029-Oct-2015 $25,082.0847700205-Nov-2015 $30,000.00Granted28-Jan-2016 $14,379.19$0.00$0.00$4,702.89$6,000.00$0.00false
2014$20,000.0023-Oct-2014 $24,607.56$17,597.31$0.00$0.00$3,010.25$4,000.00$0.00false
2013$20,000.0015-Nov-2013 $22,740.42$17,814.92$0.00$0.00$925.50$4,000.00$0.00false
2012$15,000.0013-Dec-2012 $31,959.00$27,384.00$0.00$0.00$1,575.00$3,000.00$0.00false
2011$15,000.0018-Nov-2011 $2,977.0038556121-Nov-2011 $15,000.00Granted07-Feb-2012 $0.00$0.00$0.00$1,322.00$1,655.00$0.00false
2010$15,000.0010-Dec-2010 $1,957.0036110408-Dec-2010 $13,043.00Granted11-Apr-2011 $14.00$0.00$0.00$1,812.00$131.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
16-Jun-2008 Tenement ApplicationNT Cleared