Cache entry for E 08/1771

Extracted from MTO on 22-Jul-2017 03:35, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 08/1771-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:47 BL
Purposes:Term:5 Years (Extended)
Markout:Received:17-Jan-2007 09:20
Commence:18-Jan-2008 Expiry:17-Jan-2018

Holders

Company NameCorrespondence AddressSharesTotal Shares
MITSUI IRON ORE DEVELOPMENT PTY LTDC/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600140200
NORTH MINING LIMITEDC/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 683770200
ROBE RIVER MINING CO. PTY LIMITEDC/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 683760200
CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600110200
PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600120200

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
ROBE RIVER MINING CO. PTY LIMITEDC/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 683760200
MITSUI IRON ORE DEVELOPMENT PTY LTDC/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600140200
NORTH MINING LIMITEDC/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 683770200
CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600110200
PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600120200

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 120AAConversion 255273FinalisedM 08/399Dead
Section 120AAConversion 255273FinalisedM 08/447Dead
Section 120AAConversion 255273FinalisedM 08/446Dead
Section 120AAConversion 255273FinalisedM 08/445Dead
Section 120AAConversion 255273FinalisedM 08/443Dead
Section 120AAConversion 255273FinalisedM 08/441Dead
Section 120AAConversion 255273FinalisedM 08/440Dead
Section 120AAConversion 255273FinalisedM 08/425Dead
Section 120AAConversion 255273FinalisedM 08/424Dead
Section 120AAConversion 255273FinalisedM 08/423Dead
Section 120AAConversion 255273FinalisedM 08/422Dead
Section 120AAConversion 255273FinalisedM 08/421Dead
Section 120AAConversion 255273FinalisedM 08/420Dead
Section 120AAConversion 255273FinalisedM 08/419Dead
Section 120AAConversion 255273FinalisedM 08/418Dead
Section 120AAConversion 255273FinalisedM 08/417Dead
Section 120AAConversion 255273FinalisedM 08/416Dead
Section 120AAConversion 255273FinalisedM 08/415Dead
Section 120AAConversion 255273FinalisedM 08/414Dead
Section 120AAConversion 255273FinalisedM 08/413Dead
Section 120AAConversion 255273FinalisedM 08/412Dead
Section 120AAConversion 255273FinalisedM 08/411Dead
Section 120AAConversion 255273FinalisedM 08/410Dead
Section 120AAConversion 255273FinalisedM 08/409Dead
Section 120AAConversion 255273FinalisedM 08/408Dead
Section 120AAConversion 255273FinalisedM 08/407Dead
Section 120AAConversion 255273FinalisedM 08/406Dead
Section 120AAConversion 255273FinalisedM 08/405Dead
Section 120AAConversion 255273FinalisedM 08/404Dead
Section 120AAConversion 255273FinalisedM 08/403Dead
Section 120AAConversion 255273FinalisedM 08/402Dead
Section 120AAConversion 255273FinalisedM 08/401Dead
Section 120AAConversion 255273FinalisedM 08/400Dead
Amalgamation (Same Holder)Amalgamation 287450GrantedP 08/536Dead

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25017-Jan-2007 47.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.18-Jan-2008
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.18-Jan-2008
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.18-Jan-2008
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.18-Jan-2008
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.18-Jan-2008
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
18-Jan-2008
71No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.18-Jan-2008
81No interference with Geodetic Survey Station SSM- Yarraloola 21, SSM- Yarraloola 22, SSM- YLA 147, SSM- YLA 148, SSM- YLA 149, SSM- YLA 150, SSM- YLA 151 and SSM- KAP 7 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.18-Jan-2008
91No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within FNA 3928 (Yarralo) as shown in TENGRAPH.18-Jan-2008
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP.18-Jan-2008
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.18-Jan-2008
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.18-Jan-2008
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer, DoCEP.18-Jan-2008
141Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP.18-Jan-2008
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.18-Jan-2008
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.18-Jan-2008
172The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (Reg ID 35925) "Programme of Work on E08/1771 for Rio Tinto Iron Ore Pty Ltd" dated 4 July 2012 signed by Genevieve Thompson and retained on Department of Mines and Petroleum File No. EARS-POW-35925;
  • "Programme of Work on E08/1771, E08/1196 and E08/788 for Rio Tinto Iron Ore Pty Limited" (Reg ID: 38752) dated 28 February 2013 signed by Pia Motteram, and retained on Department of Mines and Petroleum file No. EARS-POW-38752                                        
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
30-Jul-2013
171The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (Reg ID 35925) "Programme of Work on E08/1771 for Rio Tinto Iron Ore Pty Ltd" dated 4 July 2012 signed by Genevieve Thompson and retained on Department of Mines and Petroleum File No. EARS-POW-35925                                        
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
08-Oct-2012 29-Jul-2013
181The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.08-Oct-2012
191All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.08-Oct-2012

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.18-Jan-2008
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.18-Jan-2008
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.18-Jan-2008
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.18-Jan-2008
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.18-Jan-2008
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
18-Jan-2008
71No excavation, excepting shafts, approaching closer to the North West Coastal Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the North West Coastal Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.18-Jan-2008
81No interference with Geodetic Survey Station SSM- Yarraloola 21, SSM- Yarraloola 22, SSM- YLA 147, SSM- YLA 148, SSM- YLA 149, SSM- YLA 150, SSM- YLA 151 and SSM- KAP 7 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.18-Jan-2008
91No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within FNA 3928 (Yarralo) as shown in TENGRAPH.18-Jan-2008
101No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP.18-Jan-2008
111No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline.18-Jan-2008
121The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.18-Jan-2008
131No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer, DoCEP.18-Jan-2008
141Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP.18-Jan-2008
151The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline.18-Jan-2008
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline.18-Jan-2008
172The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (Reg ID 35925) "Programme of Work on E08/1771 for Rio Tinto Iron Ore Pty Ltd" dated 4 July 2012 signed by Genevieve Thompson and retained on Department of Mines and Petroleum File No. EARS-POW-35925;
  • "Programme of Work on E08/1771, E08/1196 and E08/788 for Rio Tinto Iron Ore Pty Limited" (Reg ID: 38752) dated 28 February 2013 signed by Pia Motteram, and retained on Department of Mines and Petroleum file No. EARS-POW-38752                                        
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
30-Jul-2013
171The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (Reg ID 35925) "Programme of Work on E08/1771 for Rio Tinto Iron Ore Pty Ltd" dated 4 July 2012 signed by Genevieve Thompson and retained on Department of Mines and Petroleum File No. EARS-POW-35925                                        
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
08-Oct-2012 29-Jul-2013
181The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.08-Oct-2012
191All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.08-Oct-2012

Dealings

TypeNumberDetails
Miscellaneous EntryNippon Steel Australia Pty Limited (6/200th shares) Sumitomo Metal Australia Pty Ltd (2/200th shares) Mitsui Iron Ore Development Pty Ltd (2/200th shares) as joint tenants carrying on business in partnership under the registered business name "Cape Lambert Iron Associates" Nippon Steel Australia Pty Limited (15/200th shares) Sumitomo Metal Australia Pty Ltd (5/200th shares) as joint tenants carrying on business in partnership under the registered business name "Pannawonica Iron Associates"
Amalgamation287450Lodged 10:39 AM on 28 Mar 2008 to amalgamate part P08/536 into E08/1771RECORDED 10:39 AM 28 Mar 2008Granted 28/11/2008 in respect to P 08/536
Bond405741Lodged:10:00 11 September 2012Bond Type:Unconditional Performance BondBond Amount:$10,000.00RECORDED:11 September 2012RETIRED:30 July 2013
Bond Requirement407006Requirement Date:02/10/2012Amount:$10,000.00RECORDED:11:37:44 08 October 2012FINALISED:13:40:18 30 July 2013
Extension / Renewal of Term413810Lodged:12:55 20 December 2012Applied For Period:5 YearsRECORDED:12:55 20 December 2012GRANTED:22 January 2013Granted Period:5 YearsTerm Extended To:17/01/2018
Partial Surrender - Compulsory414033Lodged:15:00 21 December 2012Section:Section 65 (3)Surrendered Blocks:HAMERSLEY RANGE 1461 g, m, r, w, x HAMERSLEY RANGE 1533 b, c, d, g, h, j, k, m, n, o, p, r, s, t, u, w, x, y, z HAMERSLEY RANGE 1534 f, g, l, m, q, r, v, wSurrendered Total:32 BL.REGISTERED:Midnight 17 January 2013Surrendered area to be released 08:30:00 05/02/2013 under Section 65 (3)Surrendered area released 08:30:00 05/02/2013 under Section 65 (3)
Bond426685Lodged:10:00 05 July 2013Bond Type:Unconditional Performance BondBond Amount:$50,000.00RECORDED:05 July 2013RETIRED - MRF:27 October 2014
Bond Requirement427749Requirement Date:25/07/2013Amount:$50,000.00RECORDED:00:00 30 July 2013FINALISED:11:40:40 27 October 2014
Application to Amend444687Lodged:15:10 17 April 2014Amending:AddressFrom:ROBE RIVER MINING CO. PTY LTD, C/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 6837To:ROBE RIVER MINING CO. PTY LTD, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837RECORDED:15:10 17 April 2014

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201822-Nov-2016 MT-210010825206-EF$24,327.2047 BL17-Jan-2013 $24,327.20$0.00
Rental201719-Nov-2015 MT-210010427162-EF$23,528.2047 BL17-Jan-2013 $23,528.20$0.00
Rental201621-Nov-2014 06-140818PERTH$22,931.3047 BL17-Jan-2013 $22,931.30$0.00
Rental201515-Nov-2013 10-000230PERTH$11,801.7047 BL17-Jan-2013 $11,801.70$0.00
Rental201422-Jan-2013 (REFUND) 06-117632PERTH$7,878.4047 BL17-Jan-2013 $11,571.40$0.00
Rental201419-Nov-2012 06-117632PERTH$19,449.80
Rental201314-Nov-2011 102540PERTH$13,943.5079 BL18-Jan-2008 $13,943.50$0.00
Rental201222-Nov-2010 87005PERTH$14,885.9779 BL18-Jan-2008 $14,885.97$0.00
Rental201109-Nov-2009 72096PERTH$9,367.8279 BL18-Jan-2008 $9,367.82$0.00
Rental201024-Nov-2008 58845PERTH$8,994.1579 BL18-Jan-2008 $8,994.15$0.00
Rental200915-Nov-2007 44813PERTH$754.4579 BL18-Jan-2008 $8,298.95$0.00
Rental200917-Jan-2007 2565KARRATHA$7,544.50

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$141,000.00false
2017$141,000.0021-Feb-2017 $153,259.26$122,793.84$0.00$0.00$29,955.58$509.84$0.00false
2016$141,000.0018-Feb-2016 $152,095.04$122,843.96$0.00$0.00$29,135.20$115.88$0.00false
2015$94,000.0016-Feb-2015 $154,256.00$116,612.00$0.00$158.00$35,585.00$1,901.00$0.00false
2014$94,000.0014-Feb-2014 $120,554.00$27,545.00$0.00$82,769.00$7,310.00$2,930.00$0.00false
2013$118,500.0020-Feb-2013 $121,558.00$95,226.00$0.00$0.00$26,332.00$0.00$0.00false
2012$118,500.0024-Feb-2012 $134,160.00$61,839.00$0.00$51,612.00$20,709.00$0.00$0.00false
2011$79,000.0004-Feb-2011 $100,552.00$80,705.00$0.00$0.00$19,772.00$75.00$0.00false
2010$79,000.0019-Feb-2010 $93,653.00$79,557.00$0.00$0.00$14,096.00$0.00$0.00false
2009$79,000.0018-Feb-2009 $93,413.00$66,019.00$0.00$10,630.00$14,764.00$2,000.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
427749Bond Requirement$50,000.0025-Jul-2013 Finalised27-Oct-2014 Unconditional Performance Bondtrue
426685Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$50,000.00 (Inital)05-Jul-2013 Retired - MRF27-Oct-2014 Unconditional Performance Bondtrue
407006Bond Requirement$10,000.0028-Sep-2012 Finalised30-Jul-2013 Unconditional Performance Bondtrue
405741Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$10,000.00 (Inital)11-Sep-2012 Retired30-Jul-2013 Unconditional Performance Bondtrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
02-Jun-2008 Tenement ApplicationNT Cleared