Extracted from MTO on 19-Jan-2021 04:17,
last changed 14-Oct-2020.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 13-Sep-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 13-Sep-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Sep-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Sep-2007 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Sep-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Sep-2007 | |
7 | 1 | No interference with Geodetic Survey Station Whyloo 69, 71, 72, 73, 74, 75 ,76T,Mount Bruce 176, 177, 178T, 178, 179, 180, 181, 220, NMF 631, Turee Creek 2,Whl 140 & 141 & MBC 326 & 339. and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2007 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2007 | |
9 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline. | 13-Sep-2007 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 13-Sep-2007 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 13-Sep-2007 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 13-Sep-2007 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 13-Sep-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 13-Sep-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Sep-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Sep-2007 | |
5 | 1 | The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Sep-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Sep-2007 | |
7 | 1 | No interference with Geodetic Survey Station Whyloo 69, 71, 72, 73, 74, 75 ,76T,Mount Bruce 176, 177, 178T, 178, 179, 180, 181, 220, NMF 631, Turee Creek 2,Whl 140 & 141 & MBC 326 & 339. and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2007 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 13-Sep-2007 | |
9 | 1 | No mining within 25 metres of either side of the Goldfields Gas pipeline. | 13-Sep-2007 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 13-Sep-2007 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 13-Sep-2007 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 13-Sep-2007 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 13-Sep-2007 | |
Type | Number | Details |
Application to Amend | 286875 | Lodged 9:30:00 AM on 25 Mar 2008 amending address for Newcrest Operations Ltd to read "C/- Australian Tenement Manager, Newcrest Mining Ltd, PO Box 6213, St Kilda Road Central VIC 8008"RECORDED 9:30 AM 25 Mar 2008 |
Forfeiture | 349703 | Initiated:25/06/2010 for non-compliance with expenditure conditionsRECORDED:08:30 25 June 2010Notice Issued:Regulation 50 Notice sent 25/06/2010 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:25/07/2010FINALISED:Order by Minister on 24 September 2010 that E 08/1650 be Penalty Imposed |
Fine | 356366 | Fine in respect to:Forfeiture Process 349703Fine reason:Non-compliance with expenditure obligationsPenalty amount:$15,629.00Notification date:29/09/2010Due date:29/10/2010Pursuant to:Section 96A(5)RECORDED:29 September 2010PAYMENT RECEIVED:11 October 2010Receipt Number:85207Amount:$15,629.00Remaining balance:$0.00FINALISED:11 October 2010 |
Application to Amend | 358717 | Lodged:16:15 04 November 2010Amending:AddressFrom:SIPA EXPLORATION NL, PO BOX 1183, WEST PERTH, WA, 6872To:SIPA EXPLORATION NL, C/- ADVANCED TENEMENT SERVICES, PO BOX 1110, BENTLEY DC, WA, 6983RECORDED:16:15 04 November 2010 |
Extension of Time | 361206 | Lodged:15:43 09 December 2010Type:Stat DecRECORDED:15:43 09 December 2010Extension of time until 17 December 2010 to lodge a statutory declaration in support of Appln 359075 for exemption from expenditure condition for the year ending 12 September 2010APPROVED:09:32:14 10 December 2010 |
Application for Forfeiture | KR15/101 | Lodged:10:32 07 February 2011Applicant:HARD ROCK RESOURCES PTY LTDRespondent:SIPA EXPLORATION NLRECORDED:10:32 07 February 2011In terms of Memorandum of Orders by Consent. Security for costs to be be paid by DMP to Hard Rock Resources.Warden's Determination:Dismissed 02/04/2012 10:00:00 |
Amalgamation | 377173 | Lodged:15:25 20 July 2011Amalgamating:Portion of former P 08/491Situated within:External boundaries of E 08/1650Granted 04/11/2013 in respect to P 08/491 |
Application to Amend | 379425 | Lodged:15:00 15 August 2011Amending:AddressFrom:Residential : SIPA EXPLORATION NL, SAME AS CORRESPONDENCE and Correspondance :SIPA EXPLORATION NLC/- ADVANCED TENEMENT SERVICES, PO BOX 1110, BENTLEY DC, WA, 6983To:Residential : SIPA EXPLORATION NL, ADDRESS NOT PROVIDED and Correspondance :SIPA EXPLORATION NLC/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:15:00 15 August 2011 |
Application to Amend | 404433 | Lodged:13:50 23 August 2012Amending:AddressFrom:NORTHERN STAR RESOURCES LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021To:NORTHERN STAR RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:13:50 23 August 2012 |
Deferral of Drop Off | 405803 | Lodged:14:35 11 September 2012RECORDED:14:35 11 September 2012GRANTED:12 November 2012Section 65(3) Compulsory Surrender for 40% of the licence is due to be lodged prior to 12 September 2013. |
Extension / Renewal of Term | 405862 | Lodged:14:35 11 September 2012Applied For Period:5 YearsRECORDED:14:35 11 September 2012GRANTED:12 November 2012Granted Period:5 YearsTerm Extended To:12/09/2017 |
Partial Surrender - Voluntary | 430936 | Lodged:13:39:53 09 September 2013Surrendered Blocks:HAMERSLEY RANGE 2481 p
HAMERSLEY RANGE 2482 l, r, s, x, y
HAMERSLEY RANGE 2483 l
HAMERSLEY RANGE 2554 c, d, e
HAMERSLEY RANGE 2555 a, f, g, n, o, p
HAMERSLEY RANGE 2556 b, c, l, r, s, t, u, z
HAMERSLEY RANGE 2557 v, w, x
HAMERSLEY RANGE 2628 e, k
HAMERSLEY RANGE 2629 a, b, c, d, f, g, h, j, m, n, o, p, s, t, u, y, z
HAMERSLEY RANGE 2630 q, r, v, w, x, y
HAMERSLEY RANGE 2701 p
HAMERSLEY RANGE 2702 b, c, d, e, f, g, h, j, l, m, n, q, r, s, t, u, y, z
HAMERSLEY RANGE 2703 q, r, z
HAMERSLEY RANGE 2775 a, e, h, j, kSurrendered Total:79 BL.REGISTERED:13:39:53 09 September 2013 |
Mortgage | 440185 | Lodged:12:10 10 February 2014Mortgaged Shares:100/100 shares NORTHERN STAR RESOURCES LTDMortgagee:INVESTEC BANK (AUSTRALIA) LTDREGISTERED:12:10 10 February 2014DISCHARGED:11:55 31 July 2014Full Discharge:451863 Registered 11:55 31 July 2014 |
Mortgage - Discharge | 451863 | Lodged:11:55 31 July 2014In respect to:Mortgage 440185REGISTERED:11:55 31 July 2014 |
Caveat | 470091 | Lodged:16:10 25 June 2015Caveat Type:Consent CaveatCaveator:SIPA EXPLORATION NLShares Caveated:100/100 shares NORTHERN STAR RESOURCES LTDRECORDED:16:10 25 June 2015Pursuant to Section 122E(c) of the Mining Act Voluntary Partial Surrender 477059 be registered while Caveat 470091 remains in force.Order under Section 122E(1)(c) Caveat 470091 remains in full force while Voluntary Partial Surrender 496225 be registered, signed by Warden Huston on 03/11/2016 |
Application to Amend | 476104 | Lodged:15:29:07 19 October 2015Amending:AddressFrom:NORTHERN STAR RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:15:29:07 19 October 2015 |
Partial Surrender - Voluntary | 477059 | Lodged:16:00:48 05 November 2015Surrendered Blocks:HAMERSLEY RANGE 2556 d, e, k
HAMERSLEY RANGE 2557 a, b, c, f, g, h, j, k
HAMERSLEY RANGE 2704 vSurrendered Total:12 BL.Pursuant to Section 122E(c) of the Mining Act Voluntary Partial Surrender 477059 be registered while Caveat 470091 remains in force.REGISTERED:10:00 09 November 2015 |
Retention Status | 490397 | Lodged:11:30:51 11 July 2016RECORDED:11:30:51 11 July 2016WITHDRAWN:11:50:31 24 October 2016 |
Partial Surrender - Voluntary | 496225 | Lodged:11:08:21 28 October 2016Surrendered Blocks:HAMERSLEY RANGE 2482 m, n, t, u, z
HAMERSLEY RANGE 2483 q, r, v, w, x, y
HAMERSLEY RANGE 2554 j, k
HAMERSLEY RANGE 2555 b, c, h, j, k
HAMERSLEY RANGE 2556 a, f, g, h, j, m, n, o, p
HAMERSLEY RANGE 2557 l, m, n, o, p, q, r, s, t, u, y, z
HAMERSLEY RANGE 2558 l, m, q, v
HAMERSLEY RANGE 2629 e, k
HAMERSLEY RANGE 2630 a, f, g, h, l, m, n, o, p, s, t, u, z
HAMERSLEY RANGE 2631 l, q, r, v, w, x
HAMERSLEY RANGE 2701 d, e, j, k
HAMERSLEY RANGE 2702 a, k, o, p
HAMERSLEY RANGE 2703 a, b, c, d, f, g, h, j, k, l, m, n, o, p, s, t, u, v, w, x, y
HAMERSLEY RANGE 2704 l, q
HAMERSLEY RANGE 2775 b, c, dSurrendered Total:98 BL.REGISTERED:10:00 03 November 2016Order under Section 122E(1)(c) Caveat 470091 remains in full force while Voluntary Partial Surrender 496225 be registered, signed by Warden Huston on 03/11/2016 |
Extension / Renewal of Term | 514234 | Lodged:09:49:34 11 September 2017Applied For Period:2 YearsRECORDED:09:49:34 11 September 2017GRANTED:14 November 2017Granted Period:2 YearsTerm Extended To:12/09/2019 |
Application for Forfeiture | 515252 | Lodged:16:07:37 26 September 2017Applicant:BARACUS PTY LTDRespondent:NORTHERN STAR RESOURCES LTDRECORDED:16:07:37 26 September 2017Warden's Determination:Withdrawn 13/10/2017 10:00:00WITHDRAWN:10:00:01 13 October 2017 |
Extension / Renewal of Term | 562754 | Lodged:15:18:13 10 September 2019Applied For Period:2 YearsRECORDED:15:18:13 10 September 2019GRANTED:28 October 2019Granted Period:2 YearsTerm Extended To:12/09/2021 |