Cache entry for E 08/1148

Extracted from MTO on 23-Jul-2017 03:35, last changed 12-Jul-2017.

Tenement Summary

Identifier:E 08/1148-IType:Exploration Licence
Status:LiveDistrict:ASHBURTON M.F.
Lodged:KARRATHAArea:6 BL
Purposes:Term:5 Years (Extended)
Markout:Received:27-Aug-1999 09:00
Commence:23-Apr-2002 Expiry:22-Apr-2018

Holders

Company NameCorrespondence AddressSharesTotal Shares
MITSUI IRON ORE DEVELOPMENT PTY LTDC/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600140200
NORTH MINING LIMITEDC/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 683770200
ROBE RIVER MINING CO. PTY LIMITEDC/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 683760200
CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600110200
PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600120200

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
MITSUI IRON ORE DEVELOPMENT PTY LTDC/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600140200
NORTH MINING LIMITEDC/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 683770200
ROBE RIVER MINING CO. PTY LIMITEDC/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 683760200
CAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600110200
PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)C/- JOHN SMITH, GENERAL MANAGER ADMINISTRATION GPO BOX 2585, PERTH, WA, 600120200

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 67Conversion 121361FinalisedM 08/392Dead
Section 67Conversion 129883FinalisedM 08/393Dead
Section 67Conversion 202820FinalisedM 08/390Dead
Section 67Conversion 215472FinalisedM 08/391Dead

Shires

Shire NameShire NumberStartArea
ASHBURTON SHIRE25027-Aug-1999 6.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.23-Apr-2002
22All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DOIR.29-Oct-2004
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer.23-Apr-2002 28-Oct-2004
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme.23-Apr-2002
42Unless the written approval of the Environmental Officer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Oct-2004
41Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.23-Apr-2002 28-Oct-2004
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.23-Apr-2002
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee.
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
23-Apr-2002
1Consent to mine on Stock Route Reserve 9701 granted subject to:23-Apr-2002
71No mining operations being carried out on Stock Route Reserve 9701 which restrict the use of the reserve.23-Apr-2002
82The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of work for Robe River Mining on E08/1148 (EXP 7367)" dated 23 August 2007 signed by Anil Subramanya and retained on Department of Industry and Resources File No. T0528/200701;
  • "Programme of Work on E08/1148 for Rio Tinto Iron Ore Pty Ltd" (Reg ID 37053) dated 18 September 2012 signed by Genevieve Thompson and retained on Department of Mines and Petroleum File No. EARS-POW-37053
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
14-May-2013
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of work for Robe River Mining on E08/1148 (EXP 7367)" dated 23 August 2007 signed by Anil Subramanya and retained on Department of Industry and Resources File No. T0528/200701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
26-Oct-2007 13-May-2013
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Oct-2007
101The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $25,000.
26-Oct-2007 14-May-2013
111All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.14-May-2013

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.23-Apr-2002
22All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DOIR.29-Oct-2004
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer.23-Apr-2002 28-Oct-2004
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme.23-Apr-2002
42Unless the written approval of the Environmental Officer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Oct-2004
41Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.23-Apr-2002 28-Oct-2004
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.23-Apr-2002
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee.
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
23-Apr-2002
1Consent to mine on Stock Route Reserve 9701 granted subject to:23-Apr-2002
71No mining operations being carried out on Stock Route Reserve 9701 which restrict the use of the reserve.23-Apr-2002
82The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of work for Robe River Mining on E08/1148 (EXP 7367)" dated 23 August 2007 signed by Anil Subramanya and retained on Department of Industry and Resources File No. T0528/200701;
  • "Programme of Work on E08/1148 for Rio Tinto Iron Ore Pty Ltd" (Reg ID 37053) dated 18 September 2012 signed by Genevieve Thompson and retained on Department of Mines and Petroleum File No. EARS-POW-37053
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
14-May-2013
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
  • "Programme of work for Robe River Mining on E08/1148 (EXP 7367)" dated 23 August 2007 signed by Anil Subramanya and retained on Department of Industry and Resources File No. T0528/200701.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
26-Oct-2007 13-May-2013
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Oct-2007
101The Licensee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister responsible for the Mining Act 1978 for due compliance with the environmental conditions of the lease in the sum of:
  • $25,000.
26-Oct-2007 14-May-2013
111All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.14-May-2013

Dealings

TypeNumberDetails
Miscellaneous EntryNippon Steel Australia Pty Limited (6/200th shares) Sumitomo Metal Australia Pty Ltd (2/200th shares) Mitsui Iron Ore Development Pty Ltd (2/200th shares) as joint tenants carrying on business in partnership under the registered business name "Cape Lambert Iron Associates"Nippon Steel Australia Pty Limited (15/200th shares) Sumitomo Metal Australia Pty Ltd (5/200th shares) as joint tenants carrying on business in partnership under the registered business name "Pannawonica Iron Associates"
Exemption from Drop-off240H/045Lodged 9:30:00 AM on 13 Apr 2005 applying for relief from the provisions of Section 65(1)(a)GRANTED 07 Jul 2005
Conversion202820Lodged 8:30:00 AM on 08 Feb 2006 M08/390 applied for pursuant to Section 67.RECORDED 8:30 AM 08 Feb 2006Discontinued due to M 08/390 Withdrawn 12:03 21 June 2010
Conversion129883Lodged 8:30:00 AM on 08 Feb 2006 M08/393 applied for pursuant to Section 67.RECORDED 8:30 AM 08 Feb 2006Discontinued due to M 08/393 Withdrawn 12:03 21 June 2010
Conversion215472Lodged 8:30:00 AM on 08 Feb 2006 M 08/391 applied for pursuant to Section 67.RECORDED 8:30 AM 08 Feb 2006LAPSED 18 Jan 2008 on the commencement of term of E08/1172 pursuant to Section 120AA and licence partially expired
Conversion121361Lodged 8:30:00 AM on 08 Feb 2006 M 08/392 applied for pursuant to Section 67.RECORDED 8:30 AM 08 Feb 2006LAPSED 18 Jan 2008 on the commencement of term of E08/1172 pursuant to Section 120AA and licence partially expired
Exemption from Drop-off233H/056Lodged 2:35:00 PM on 24 Feb 2006 applying for relief from the provisions of Section 65(1)(b)GRANTED 11 Apr 2006
Extension / Renewal of Term146/067Lodged 11:31:00 AM on 15 Mar 2007 applied for a period of 2 YearsRECORDED 11:31 AM 15 Mar 2007GRANTED 17 Jan 2008 for a further period of 2 Years
Bond275268Lodged on 20 Sep 2007 For $25,000.00RECORDED 20 Sep 2007Lodged:00:00 20 September 2007Bond Type:Unconditional Performance BondBond Amount:$25,000.00RECORDED:20 September 2007RETIRED:14 May 2013
Bond Requirement307531Requirement Date:26/10/2007Amount:$25,000.00RECORDED:14:20:57 26 October 2007FINALISED:12:48:34 14 May 2013
Expiry - Partial226521in respect to Hamersley Range blocks 1464 b, g, m, r, w, 1536 b, g, m, n contained in the granted boundaries of E08/1772 Pursuant to S120AA.RECORDED 12.00 Midnight 18 Jan 2008
Extension / Renewal of Term316215Lodged:12:30 24 March 2009Applied For Period:2 YearsRECORDED:12:30 24 March 2009GRANTED:07 January 2010Granted Period:2 YearsTerm Extended To:22/04/2011
Extension / Renewal of Term368229Lodged:11:56 25 March 2011Applied For Period:1 YearsRECORDED:11:56 25 March 2011GRANTED:15 April 2011Granted Period:1 YearsTerm Extended To:22/04/2012
Extension / Renewal of Term393921Lodged:13:00 23 March 2012Applied For Period:1 YearsRECORDED:13:00 23 March 2012GRANTED:19 June 2012Granted Period:1 YearsTerm Extended To:22/04/2013
Extension / Renewal of Term418550Lodged:11:40 08 March 2013Applied For Period:1 YearsRECORDED:11:40 08 March 2013GRANTED:17 April 2013Granted Period:1 YearsTerm Extended To:22/04/2014
Bond420583Lodged:09:30 08 April 2013Bond Type:Unconditional Performance BondBond Amount:$40,000.00RECORDED:08 April 2013RETIRED - MRF:27 October 2014
Bond Requirement422889Requirement Date:10/05/2013Amount:$40,000.00RECORDED:00:00 14 May 2013FINALISED:11:08:22 27 October 2014
Extension / Renewal of Term442988Lodged:15:30 26 March 2014Applied For Period:1 YearsRECORDED:15:30 26 March 2014GRANTED:30 April 2014Granted Period:1 YearsTerm Extended To:22/04/2015
Application to Amend444687Lodged:15:10 17 April 2014Amending:AddressFrom:ROBE RIVER MINING CO. PTY LTD, C/- RIO TINTO IRON ORE, LAND ASSETS DEPARTMENT GPO BOX A42, PERTH, WA, 6837To:ROBE RIVER MINING CO. PTY LTD, C/- RIO TINTO IRON ORE TENURE MANAGEMENT & STRATEGY, GPO BOX A42, PERTH, WA, 6837RECORDED:15:10 17 April 2014
Extension / Renewal of Term464713Lodged:13:40 27 March 2015Applied For Period:1 YearsRECORDED:13:40 27 March 2015GRANTED:16 July 2015Granted Period:1 YearsTerm Extended To:22/04/2016
Extension / Renewal of Term483780Lodged:16:19:57 23 March 2016Applied For Period:1 YearsRECORDED:16:19:57 23 March 2016GRANTED:27 May 2016Granted Period:1 YearsTerm Extended To:22/04/2017
Extension / Renewal of Term503556Lodged:13:07:25 29 March 2017Applied For Period:1 YearsRECORDED:13:07:25 29 March 2017GRANTED:26 June 2017Granted Period:1 YearsTerm Extended To:22/04/2018

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201817-Feb-2017 MT-210010932915-EF$3,105.606 BL18-Jan-2008 $3,105.60$0.00
Rental201711-Feb-2016 MT-210010506808-EF$3,003.606 BL18-Jan-2008 $3,003.60$0.00
Rental201616-Feb-2015 06-142957PERTH$2,927.406 BL18-Jan-2008 $2,927.40$0.00
Rental201519-Feb-2014 06-133031PERTH$2,853.006 BL18-Jan-2008 $2,853.00$0.00
Rental201414-Feb-2013 10-000114PERTH$2,797.206 BL18-Jan-2008 $2,797.20$0.00
Rental201313-Feb-2012 06-105932PERTH$2,721.006 BL18-Jan-2008 $2,721.00$0.00
Rental201214-Feb-2011 89985PERTH$2,905.986 BL18-Jan-2008 $2,905.98$0.00
Rental201117-Feb-2010 75791PERTH$2,845.926 BL18-Jan-2008 $2,845.92$0.00
Rental201006-Feb-2009 61239PERTH$2,731.086 BL18-Jan-2008 $2,731.08$0.00
Rental200923-Apr-2008 (REFUND) 47429PERTH$2,091.876 BL18-Jan-2008 $1,394.58$0.00
Rental200929-Jan-2008 47429PERTH$3,486.45
Rental200823-Apr-2008 (REFUND) 34393PERTH$587.2415 BL23-Apr-2002 $2,739.16$0.00
Rental200819-Feb-2007 34393PERTH$3,326.40
Rental200713-Mar-2006 21995PERTH$2,366.1015 BL23-Apr-2002 $2,366.10$0.00
Rental200601-Apr-2005 9460PERTH$1,485.0015 BL23-Apr-2002 $1,485.00$0.00
Rental200530-Apr-2004 71483PERTH$1,442.1015 BL23-Apr-2002 $1,442.10$0.00
Rental200418-Mar-2003 58419PERTH$1,395.9015 BL23-Apr-2002 $1,395.90$0.00
Rental200327-Mar-2002 47069PERTH$123.6015 BL23-Apr-2002 $1,359.60$0.00
Rental200330-Aug-1999 53334KARRATHA$1,236.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$70,000.00false
2017$70,000.0025-May-2017 $20,891.8950701325-May-2017 $49,108.11Granted11-Jul-2017 $16,861.29$0.00$0.00$4,030.60$0.00$0.00false
2016$70,000.0024-May-2016 $236,514.33$232,686.00$0.00$0.00$3,828.33$0.00$0.00false
2015$70,000.0022-May-2015 $185,951.00$179,812.00$0.00$0.00$5,751.00$388.00$0.00false
2014$70,000.0021-May-2014 $15,980.0044692722-May-2014 $54,020.00Granted25-Mar-2015 $5,913.00$0.00$5,583.00$3,444.00$1,040.00$0.00false
2013$70,000.0028-May-2013 $3,807.0042410428-May-2013 $66,193.00Granted10-Jul-2013 $460.00$0.00$0.00$3,347.00$0.00$0.00false
2012$70,000.0017-May-2012 $171,980.00$168,737.00$0.00$0.00$3,220.00$23.00$0.00false
2011$70,000.0003-May-2011 $89,002.00$31,159.00$0.00$53,725.00$3,172.00$946.00$0.00false
2010$70,000.0007-May-2010 $29,724.0034652110-May-2010 $40,276.00Granted26-Nov-2010 $21,769.00$0.00$4,474.00$3,131.00$350.00$0.00false
2009$50,000.0022-May-2009 $47,345.0032153422-May-2009 $2,655.00Granted08-Jul-2010 $44,444.00$0.00$0.00$2,879.00$22.00$0.00false
2008$50,000.0002-May-2008 $97,481.00$93,102.00$0.00$0.00$3,878.00$501.00$0.00false
2007$30,000.0024-May-2007 $82,563.00$76,052.00$0.00$0.00$3,672.00$2,839.00$0.00false
2006$20,000.0019-May-2006 $30,350.00$22,551.00$0.00$4,111.00$2,938.00$750.00$0.00false
2005$20,000.0008-Jun-2005 $87,358.00$44,167.00$0.00$37,193.00$1,998.00$4,000.00$0.00false
2004$20,000.0026-May-2004 $34,541.00$8,383.00$0.00$20,250.00$1,908.00$4,000.00$0.00false
2003$20,000.0019-May-2003 $10,753.0017919319-May-2003 $9,246.00Granted09-Sep-2003 $4,845.00$0.00$0.00$1,908.00$4,000.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
422889Bond Requirement$40,000.0010-May-2013 Finalised27-Oct-2014 Unconditional Performance Bondtrue
420583Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$40,000.00 (Inital)08-Apr-2013 Retired - MRF27-Oct-2014 Unconditional Performance Bondtrue
307531Bond Requirement$25,000.0026-Oct-2007 Finalised14-May-2013 true
275268Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$25,000.00 (Inital)20-Sep-2007 Retired14-May-2013 Unconditional Performance Bondtrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
30-Apr-2001 Tenement ApplicationNT Cleared