1 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Meda Location 15 (Yampi Defence Area CHL/105418). | 08-May-2018 | 03-Sep-2019 |
| 1 | Consent to explore on Meda Location 15 (Yampi Defence Training Area) granted subject to: | 03-Sep-2019 | |
2 | 1 | The Australian Government not guaranteeing access to the Commonwealth Land. | 03-Sep-2019 | |
3 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 03-Sep-2019 | |
4 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 03-Sep-2019 | |
5 | 1 | Any proposed future mining activities, being subject to separate approval required under the Lands Acquisition Act 1989 (Cth). | 03-Sep-2019 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 03-Sep-2019 | |
7 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Sep-2019 | |
8 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Sep-2019 | |
9 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 80671) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-80671 as Doc ID 6841916;
- (Pow Reg ID 87726) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project Version 1.4" dated 10 August 2020 submitted by Dean Tuck, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-87726 as Doc ID 7613427
| 27-Aug-2020 | |
9 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 80671) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-80671 as Doc ID 6841916
| 02-Oct-2019 | 26-Aug-2020 |
Cond # | Ver | Text | Start | End |
1 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Meda Location 15 (Yampi Defence Area CHL/105418). | 08-May-2018 | 03-Sep-2019 |
| 1 | Consent to explore on Meda Location 15 (Yampi Defence Training Area) granted subject to: | 03-Sep-2019 | |
2 | 1 | The Australian Government not guaranteeing access to the Commonwealth Land. | 03-Sep-2019 | |
3 | 1 | The licensee obtaining the relevant approvals required under the Land Acquisitions Act 1989 (Cth). | 03-Sep-2019 | |
4 | 1 | If deed of access is granted, exploration activities being limited to those specified in the deed. | 03-Sep-2019 | |
5 | 1 | Any proposed future mining activities, being subject to separate approval required under the Lands Acquisition Act 1989 (Cth). | 03-Sep-2019 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 03-Sep-2019 | |
7 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Sep-2019 | |
8 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Sep-2019 | |
9 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 80671) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-80671 as Doc ID 6841916;
- (Pow Reg ID 87726) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project Version 1.4" dated 10 August 2020 submitted by Dean Tuck, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-87726 as Doc ID 7613427
| 27-Aug-2020 | |
9 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 80671) "Dreadnought Resources Environmental Management Plan Tarraji-Yampi Project" Version 1.3, dated 2 August 2019 signed by P Chapman, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-80671 as Doc ID 6841916
| 02-Oct-2019 | 26-Aug-2020 |
Type | Number | Details |
Application to Amend | 569871 | Lodged:14:25:47 08 January 2020Amending:Address (Including DTC Details)From:Principal Place of Business : IRONRINGER (TARRAJI) PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :IRONRINGER (TARRAJI) PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : IRONRINGER (TARRAJI) PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :IRONRINGER (TARRAJI) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:14:25:47 08 January 2020 |
Application to Amend | 570552 | Lodged:16:08:51 20 January 2020Amending:NameFrom:IRONRINGER (TARRAJI) PTY LTDTo:DREADNOUGHT (KIMBERLEY) PTY LTDRECORDED:16:08:51 20 January 2020 |