Extracted from MTO on 21-Jan-2021 05:02,
last changed 25-Nov-2020.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 25-Nov-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 25-Nov-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Nov-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Nov-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-Nov-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-Nov-2015 | |
7 | 1 | No interference with Geodetic Survey Stations SSM-BROOME 11, 12, SSM-S 71 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 25-Nov-2015 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use & Benefit of Aborigines Reserve 1834, Harbour Purposes Reserve 51146 and Foreshore, Seabed and Navigable Waters. | 25-Nov-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 25-Nov-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 25-Nov-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Nov-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Nov-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-Nov-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-Nov-2015 | |
7 | 1 | No interference with Geodetic Survey Stations SSM-BROOME 11, 12, SSM-S 71 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 25-Nov-2015 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use & Benefit of Aborigines Reserve 1834, Harbour Purposes Reserve 51146 and Foreshore, Seabed and Navigable Waters. | 25-Nov-2015 | |
Type | Number | Details |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:SHEFFIELD RESOURCES LIMITED, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:SHEFFIELD RESOURCES LIMITED, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Partial Surrender - Voluntary | 514410 | Lodged:14:33:28 12 September 2017Surrendered Blocks:BROOME 1048 v, w, x, y, z
BROOME 1049 v, w, x, y
BROOME 1118 h, j, k, m, n, o, p, r, s, t
BROOME 1119 f, g, h, j, k, l, m
BROOME 1120 a, b, c, d, e, f, g, h, j, k
BROOME 1121 a, b, c, d, f, g, h, jSurrendered Total:44 BL.REGISTERED:14:33:28 12 September 2017 |
Extension of Time | 524113 | Lodged:14:55:18 20 February 2018Type:Stat DecRECORDED:14:55:18 20 February 2018APPROVED:10:16:16 22 February 2018Time extended to 6 March 2018 |
Surrender - Outright | 576411 | Lodged:14:00:31 20 April 2020REGISTERED:14:00:31 20 April 2020 |