Cache entry for E 04/2327

Extracted from MTO on 24-Nov-2017 03:37, last changed 29-Jun-2017.

Tenement Summary

Identifier:E 04/2327Type:Exploration Licence
Status:LiveDistrict:WEST KIMBERLEY M.F.
Lodged:ONLINEArea:30 BL
Purposes:Term:5 Years
Markout:Received:12-Jun-2013 14:14
Commence:15-Feb-2017 Expiry:14-Feb-2022

Holders

Company NameCorrespondence AddressSharesTotal Shares
MINGS MINING RESOURCES PTY LTDHETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
MINGS MINING RESOURCES PTY LTDC/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849100100

Shires

Shire NameShire NumberStartArea
DERBY-WEST KIMBERLEY SHIRE280012-Jun-2013 30.00000 BL

Conditions

#VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.15-Feb-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.15-Feb-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.15-Feb-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.15-Feb-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
15-Feb-2017
61No interference with Geodetic Survey Station WH 5 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.15-Feb-2017
71The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation Park Reserve 46235.15-Feb-2017

Endorsements

Cond #VerTextStartEnd
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.15-Feb-2017
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.15-Feb-2017
31Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.15-Feb-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.15-Feb-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
15-Feb-2017
61No interference with Geodetic Survey Station WH 5 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.15-Feb-2017
71The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation Park Reserve 46235.15-Feb-2017

Dealings

TypeNumberDetails
Application to Amend490149Lodged:10:41:25 07 July 2016Amending:Address (Including DTC Details)From:MINGS MINING RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:MINGS MINING RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:10:41:25 07 July 2016

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201812-Jun-2013 316316065325$3,501.0030 BL15-Feb-2017 $3,501.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$30,000.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
21-Aug-2013 Tenement ApplicationRTN Procedure : Right to Negotiate Cleared - GrantRTN Procedure30 BL17260S1251929E87km N'ly of Fitzroy Crossing2015-11-26Bunuba #2(WC2012/004)WC2012/004WAD94/2012falsePartially DeterminedSection 31 Neg Activity - Finalised
Bunuba(WC1999/019)WC1999/019WAD6133/1998falseDeterminedSection 31 Neg Activity - Finalised
10KimberleyKimberley Land Council Aboriginal Corporation
21-Aug-2013 Tenement ApplicationExpedited Procedure : Expedited Does Not ApplyExpedited Procedure2013-09-112014-01-11FINALISED - Expedited Does Not Apply2015-10-2630 BL17260S1251929E87km N'ly of Fitzroy CrossingWO2013/13452013-12-16WC2012/004Objection Upheld2015-10-23BUNUBA(WCD2012/006)WC1999/019WAD6133/1998falseWCD2012/006BOTHNoBunuba #2(WC2012/004)WC2012/004WAD94/2012falsePartially Determined10KimberleyKimberley Land Council Aboriginal Corporation