Cache entry for E 04/1893

Extracted from MTO on 18-Dec-2017 03:38, last changed 14-Dec-2017.

Tenement Summary

Identifier:E 04/1893Type:Exploration Licence
Status:LiveDistrict:WEST KIMBERLEY M.F.
Lodged:KARRATHAArea:19 BL
Purposes:Term:5 Years (Extended)
Markout:Received:09-Mar-2009 07:30
Commence:13-Jun-2011 Expiry:12-Jun-2021

Holders

Company NameCorrespondence AddressSharesTotal Shares
MERIDIAN (LENNARD SHELF PROJECT) PTY LTDC/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947100100

Applicants on Receival

Company NameCorrespondence AddressSharesTotal Shares
CULLEN EXPLORATION PTY LIMITEDC/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638 PERTH BUSINESS CENTRE, PERTH, WA, 6849100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/261Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/262Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/263Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/255Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/257Live
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/258Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/259Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/260Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/251Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/252Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/253Dead
Amalgamation (Same Holder)Amalgamation 448330GrantedP 04/254Dead
Amalgamation (Same Holder)Amalgamation 449024GrantedP 04/264Dead
Amalgamation (Same Holder)Amalgamation 449024GrantedP 04/265Dead
Amalgamation (Same Holder)Amalgamation 469057GrantedM 04/141Live
Amalgamation (Same Holder)Amalgamation 469057GrantedM 04/139Dead

Shires

Shire NameShire NumberStartArea
DERBY-WEST KIMBERLEY SHIRE280009-Mar-2009 19.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.13-Jun-2011
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.13-Jun-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.13-Jun-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.13-Jun-2011
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.13-Jun-2011
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
13-Jun-2011
71No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.13-Jun-2011
81No interference with Geodetic Survey Stations R 11 and Noonkanbah 34, 35, 36, 37, 53 & 94 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.13-Jun-2011
91The rights of ingress to and egress from Miscellaneous Licences 04/17, 04/18 and 04/19 being at all times preserved to the licensees and no interference with the purpose or installations connected to the licences.13-Jun-2011

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.13-Jun-2011
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.13-Jun-2011
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.13-Jun-2011
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.13-Jun-2011
51The licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.13-Jun-2011
61The licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the licence; or
  • registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
13-Jun-2011
71No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.13-Jun-2011
81No interference with Geodetic Survey Stations R 11 and Noonkanbah 34, 35, 36, 37, 53 & 94 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.13-Jun-2011
91The rights of ingress to and egress from Miscellaneous Licences 04/17, 04/18 and 04/19 being at all times preserved to the licensees and no interference with the purpose or installations connected to the licences.13-Jun-2011

Dealings

TypeNumberDetails
Extension of Time316611Lodged:10:35 27 March 2009Type:OtherFor late advertisingRECORDED:10:35 27 March 2009APPROVED:10:10 24 April 2009
ObjectionKR462/089Objectors:WESTERN METALS ZINC NLObjection Type:Tenement ApplicationRECORDED:11:51 07 April 2009WITHDRAWN:08:37 17 November 2009
ObjectionKR463/089Lodged:11:51 07 April 2009Objectors:LENNARD SHELF PTY LTDObjection Type:Tenement ApplicationRECORDED:11:51 07 April 2009WITHDRAWN:09:30 04 August 2010
Miscellaneous EntryIn the Karratha Warden's Court 19 June, 2009, a Ballot was conducted to determine priority between applications for Exploration Licences 04/1893 and 04/1895:- 1st Drawn:- E04/1893 2nd Drawn:- E04/1895
Miscellaneous EntryIn the Karratha Warden's Court 19 June, 2009, a Ballot was conducted to determine priority between applications for Exploration Licences 04/1893 and 04/1894:- 1st Drawn:- E04/1894 2nd Drawn:- E04/1893
Application to Amend367506Lodged:11:00 11 March 2011Amending:AddressFrom:Residential : CULLEN EXPLORATION PTY LTD, SAME AS CORRESPONDENCE and Correspondence :CULLEN EXPLORATION PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:Residential : CULLEN EXPLORATION PTY LTD, ADDRESS NOT PROVIDED and Correspondence :CULLEN EXPLORATION PTY LTD, C/- M & M WALTER CONSULTING, P O BOX 8197, SUBIACO EAST, WA, 6008RECORDED:11:00 11 March 2011
Amalgamation448330Lodged:10:27 06 June 2014Amalgamating portions of Prospecting Licences 04/251, 04/257 & 04/261 and the whole of Prospecting Licences 04/252, 04/253, 04/254, 04/255 , 04/258, 04/259, 04/260, 04/262 & 04/263 situated within the external boundaries of this licence.GRANTED 14 January 2015
Amalgamation449024Lodged:13:20 17 June 2014Amalgamating the whole of Prospecting Licences 04/264 and 04/265 situated within the external boundaries of this licence. GRANTED 3 December 2014
Amalgamation469057Lodged:10:55 11 June 2015Amalgamating portion of M04/139 and portion of M04/141 within the external boundaries of E04/1893GRANTED 01 April 2016
Extension / Renewal of Term487535Lodged:10:40:44 30 May 2016Applied For Period:5 YearsRECORDED:10:40:44 30 May 2016GRANTED:02 September 2016Granted Period:5 YearsTerm Extended To:12/06/2021
Caveat501279Lodged:10:58:26 17 February 2017Caveat Type:Consent CaveatCaveator:LENNARD SHELF PTY LTDShares Caveated:100/100 shares MERIDIAN (LENNARD SHELF PROJECT) PTY LTDRECORDED:10:58:26 17 February 2017
Partial Surrender - Compulsory507588Lodged:08:30 06 June 2017Section:Section 65 (3)Surrendered Blocks:BROOME 2302 d, j BROOME 2303 h, j, n, o, t, u, z BROOME 2375 b BROOME 2376 a, gSurrendered Total:12 BL.REGISTERED:Midnight 12 June 2017Surrendered area to be released 08:30:00 14/07/2017 under Section 65 (3)Surrendered area released 08:30:00 14/07/2017 under Section 65 (3)

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental201826-Jun-2017 MT-210011118202-EF MERIDIAN MINERAL$5,193.6519 BL12-Jun-2017 $5,193.65$0.00
Rental201730-May-2016 615112496503$8,194.8531 BL13-Jun-2011 $8,194.85$0.00
Rental201622-Jun-2015 MT-210010281273-EF$5,886.9031 BL13-Jun-2011 $5,886.90$0.00
Rental201530-Jun-2014 06-136569PERTH$5,738.1031 BL13-Jun-2011 $5,738.10$0.00
Rental201419-Jun-2013 06-125194PERTH$3,617.7031 BL13-Jun-2011 $3,617.70$0.00
Rental201327-Jun-2012 06-111638PERTH$3,518.5031 BL13-Jun-2011 $3,518.50$0.00
Rental201213-Jun-2011 (REFUND) 1033PERTH$2,277.0031 BL13-Jun-2011 $3,529.35$0.00
Rental201213-Jun-2011 (REFUND) 94884PERTH$82.80
Rental201230-May-2011 94884PERTH$403.65
Rental201209-Mar-2009 1033KARRATHA$5,485.50

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2018$50,000.00false
2017$62,000.0004-Aug-2017 $62,256.00$39,004.00$0.00$0.00$10,852.00$12,400.00$0.00false
2016$46,500.0025-Jul-2016 $48,084.00$31,628.00$0.00$0.00$7,156.00$9,300.00$0.00false
2015$46,500.0007-Aug-2015 $122,411.00$107,172.00$0.00$0.00$7,936.00$7,303.00$0.00false
2014$31,000.0007-Aug-2014 $32,059.00$20,184.00$0.00$0.00$5,675.00$6,200.00$0.00false
2013$31,000.0006-Aug-2013 $32,633.00$25,830.00$0.00$0.00$5,421.00$1,382.00$0.00false
2012$31,000.0025-Jul-2012 $84,863.00$69,045.00$0.00$0.00$5,462.00$10,356.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
30-Jun-2015 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-07-102015-11-10CLEARED - Expedited Applies2016-03-24965.81 HA183930S1255242E62km SE'ly of Fitzroy CrossingWO2015/08312015-10-07WC2000/010Objection Withdrawn Agreement2016-03-24GOONIYANDI COMBINED #2(WCD2013/003)WC2000/010WAD6008/2000trueWCD2013/003EXISTYes10KimberleyKimberley Land Council Aboriginal Corporation
18-Jun-2014 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2014-07-112014-11-11CLEARED - Expedited Applies2014-12-03257.84 HA183830S1255030E62km SE'ly of Fitzroy CrossingWO2014/08252014-10-24WC2000/010Objection Withdrawn Agreement2014-12-02GOONIYANDI COMBINED #2(WCD2013/003)WC2000/010WAD6008/2000trueWCD2013/003EXISTYes10KimberleyKimberley Land Council Aboriginal Corporation
17-Jun-2014 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2014-07-022014-11-02CLEARED - Expedited Applies2015-01-071,893.68 HA184138S1255252E62km SE'ly of Fitzroy CrossingWO2014/07642014-09-18WC2000/010Objection Withdrawn Agreement2015-01-05WO2014/07882014-10-02WC1997/101Objection Withdrawn No Agreement2015-01-06GOONIYANDI COMBINED #2(WCD2013/003)WC2000/010WAD6008/2000falseWCD2013/003EXISTYesKurungal(WC1997/101)WC1997/101WAD6217/1998trueDetermined10KimberleyKimberley Land Council Aboriginal Corporation
13-Oct-2010 Tenement ApplicationNT Cleared